SHP-002 · Version 0.2 · Released October 18, 2026
Hazardous Energy Control / Lockout–Tagout
Machine-specific isolation, stored energy, verification, group work and controlled restoration.
Inside the package
18 program sections, supporting forms, a legal/client requirements crosswalk, Z10 interfaces, HOP, employer fill-ins, state selection, customization guide and product disclaimer/use terms.
State research is partial. The selector is not a fifty-state compliance determination. Resolve every pending review for your workplace before adoption.
Access the editable package
Safety & Systems account access is required. The complete program and forms are not included in this public preview.
Sign in to check access →SMS · LIMITED PREVIEW · NOT AN ADOPTED PROGRAM
Policy and HOP sample
[Employer] shall prevent harm from unexpected startup, energization, motion, or release of stored energy during servicing and maintenance. Workers shall not enter an exposed danger area until the appropriate isolation and verification have been completed. Management shall provide accessible isolating devices, suitable hardware, competent people, accurate procedures, and sufficient time. Human and organizational performance A person can select the wrong disconnect, miss a hidden supply, or misunderstand equipment status. Design the work to detect and tolerate these errors: clear asset identity, field-verified energy maps, physical barriers, personal control, and independent checks where justified. STAR, peer checks, and place-keeping support the work; they do not replace isolation or testing. Workers may pause when the equipment, procedure, source, test result, or personnel status is uncertain. Leaders shall protect good-faith intervention, listen to workers' accounts, and correct work conditions. Investigate confusing layouts, inaccessible …
Excerpt only. Full task controls, forms, crosswalk and use terms are in the protected package.
Connect the document to the system.
Supporting Z10 topics: 7.2, 8.1, 8.4, 9.1. Record the employer’s review, ownership, effective date, training and control-verification evidence. A download or completed document is not proof of implementation.
Find related courses, JHAs and tools →