Ground Rod Installation Safety Program

Free Paid

Plan ground-rod work with approved designs, utility clearance, electrical isolation, safe driving, qualified connections and valid verification, with ten employer forms.

Inside the package

Program sections, supporting forms, a legal/client requirements crosswalk, Z10 interfaces, HOP, employer fill-ins, state selection, customization guide and product disclaimer/use terms.

State research is partial. The selector is not a fifty-state compliance determination. Resolve every pending review for your workplace before adoption.

Included with active jSMS

This program is published online for jSMS users. Its standalone purchase listing is not yet available.

Sign in to check your jSMS access →

jSMS · LIMITED PREVIEW · NOT AN ADOPTED PROGRAM

Policy and HOP sample

[Employer] shall authorize ground rod work only after the installation purpose and design, full ground-penetration path, electrical condition, equipment and worker competence have been verified. Protect workers from utility strikes, electric shock, arc hazards, moving tools, flying fragments and physical strain. Stop for uncertain utilities, unexpected resistance, damaged equipment or an unverified electrical condition; do not improvise a new location, connection or test.

Excerpt only. Complete task controls, forms and use terms are available through the access options above.