SHP-085 · Version 0.1 · Released October 23, 2026
Ground Rod Installation Safety Program
Free Paid
Plan ground-rod work with approved designs, utility clearance, electrical isolation, safe driving, qualified connections and valid verification, with ten employer forms.
Inside the package
Program sections, supporting forms, a legal/client requirements crosswalk, Z10 interfaces, HOP, employer fill-ins, state selection, customization guide and product disclaimer/use terms.
State research is partial. The selector is not a fifty-state compliance determination. Resolve every pending review for your workplace before adoption.
Included with active jSMS
This program is published online for jSMS users. Its standalone purchase listing is not yet available.
jSMS · LIMITED PREVIEW · NOT AN ADOPTED PROGRAM
Policy and HOP sample
[Employer] shall authorize ground rod work only after the installation purpose and design, full ground-penetration path, electrical condition, equipment and worker competence have been verified. Protect workers from utility strikes, electric shock, arc hazards, moving tools, flying fragments and physical strain. Stop for uncertain utilities, unexpected resistance, damaged equipment or an unverified electrical condition; do not improvise a new location, connection or test.
Excerpt only. Complete task controls, forms and use terms are available through the access options above.
Connect the document to the system.
Supporting Z10 topics: 5.3, 6.1, 7.2, 7.4, 8.1, 9.1, 10. Record the employer’s review, ownership, effective date, training and control-verification evidence. A download or completed document is not proof of implementation.
Find related courses, JHAs and tools →