SHP-120 · Version 0.1 · Released October 27, 2026

Regulated Asbestos Work—EPA NESHAP and AHERA Program

Free Paid

Control regulated asbestos demolition and renovation, school AHERA duties, and OSHA worker protection with 36 forms and 56 crosswalk checks. Requires actual surveys, credentials, notices, qualified technical methods, school plans and employer adoption

Inside the package

Program sections, supporting forms, a legal/client requirements crosswalk, Z10 interfaces, HOP, employer fill-ins, state selection, customization guide and product disclaimer/use terms.

State research is partial. The selector is not a fifty-state compliance determination. Resolve every pending review for your workplace before adoption.

Included with active jSMS

This program is published online for jSMS users. Its standalone purchase listing is not yet available.

Sign in to check your jSMS access →

jSMS · LIMITED PREVIEW · NOT AN ADOPTED PROGRAM

Policy and HOP sample

[Employer/LEA] shall determine actual facility, material, project, school and worker-protection requirements; verify qualified roles and authentic evidence; and implement applicable surveys, notices, technical controls, management plans, clearance and waste follow-up. This template does not confer credentials, completed technical design, school management-plan approval or client compliance.

Excerpt only. Complete task controls, forms and use terms are available through the access options above.

Connect the document to the system.

Supporting Z10 topics: 5.3, 5.4, 6.1, 7.2, 7.4, 7.5, 8.1, 9.1, 10. Record the employer’s review, ownership, effective date, training and control-verification evidence. A download or completed document is not proof of implementation.

Find related courses, JHAs and tools →