Download the free toolbox talk
The one-page talk, editable Word version, and guidance below are open to everyone. No account required.
One-page toolbox talk
Download one-page toolbox talk (PDF, 1 page)Editable one-page toolbox talk (Word)Preview the one-page toolbox talk

Supporting documents
Included with free Safety & Systems membership.
Supervisor field check
A separate check to verify conditions and controls before work. Includes a one-page PDF and editable Word file.
Attendance sheet
A separate sign-in sheet to record the crew discussion. Includes a one-page PDF and editable Word file.
Need the crew records? Join free to use these supporting documents and the Safety & Systems Academy. No payment details. Email updates are optional.
Get supporting documents — free membershipAlready a member? Use the same link to sign in.
Hazard-based toolbox talk 47 of 52, with a practical HOP exercise.
Plan a 5–10 minute toolbox discussion, plus time to verify the actual controls. The one-page toolbox talk and editable Word version are public. Separate supervisor and attendance records are included with free Safety & Systems membership.
Why this matters
A pulling line can release energy through a broken connection, shifting anchor or sudden load movement. The hazard extends beyond the line’s visible position.
Learning objective
Confirm the pulling arrangement and protected positions before applying tension.
Key hazards or failure points
Failed lines or connections; moving anchors; trapped hands; loops tightening; unexpected load movement; lost communication.
Practical controls
- Use the task-specific pulling plan and manufacturer instructions. Have the responsible technical person establish equipment, connections, anchorage and permitted loading.
- Identify the potential movement and release areas for this arrangement. Keep people outside them; never stand inside a loop or straddle a tensioned line.
- Inspect the actual line and accessories using their applicable criteria. Agree communication, stop response and controlled release before tension is applied.
Verify It in the Field
- With tension safely absent, match equipment identifiers, connections and configuration to the plan. Required inspectors resolve damage or missing capacity information.
- From safe positions, compare barriers and assigned work locations with the assessed release path. Include direction changes, anchors and access by other crews.
- Confirm communication without operating the pull. Identify who verifies safe release before anyone approaches a snag or adjusts a connection.
Stop and reassess
Stop for a snag, slipping connection, anchor movement, damaged line, lost signal or person entering danger. Stay clear until authorized personnel control and verify the energy state.
Crew discussion questions
- Where could this system move if it releases?
- What supports this anchor and connection choice?
- Who verifies safe access after a stop?
For each required control, record its acceptance source and criterion, safe verification method, responsible verifier, actual result and time. Mark VERIFIED, HOLD/NOT VERIFIED, or N/A with a reason. Complete all required inspections; never enter danger or improvise a test to fill out a form.
Use this HOP tool
Job-site review
Before tension is applied, compare the actual line route with the briefed arrangement from outside the danger area. Identify one changed anchor, corner or access point. Ask who must reassess its effect and what evidence is needed before the pull begins.
This exercise supports hazard identification or control verification. It does not replace safeguards, required training, specialist decisions or work authorization.
Leader preparation and practical detail
Assess the whole arrangement
Illustrative situation: a line is rerouted around a corner to reach a new pulling position. The old boundary no longer describes the changed arrangement. Hold the pull while the responsible person assesses the line, direction-changing equipment, anchorage and possible movement. This resource supplies no universal exclusion radius, anchor capacity or rope discard percentage; those decisions need the actual equipment and task basis.
Do not use a snag as a strength test
A pull that stops moving may load the system differently from the planned operation. Do not add force simply to discover what will give way. Maintain separation while the operator follows the safe stopping process. Before anyone approaches or adjusts the system, authorized personnel must establish and verify the required energy state. A slack-looking section does not establish the condition of the entire arrangement.
Apply the standard to its actual activity
Construction material-handling rigging is addressed by 1926.251; general-industry hoisting slings by 1910.184. Neither is a universal standard for every towing or pulling system. Construction electric-power overhead-line installation has specific pulling provisions in 1926.964(b), including ratings, equipment condition and reliable communication. Electrical hazards and specialized stringing work require their separate protections. This briefing does not authorize utility line work, towing recovery or post-tensioning operations.
Short supervisor field check
- Pulling arrangement approved
- Gear condition verified
- Anchor basis confirmed
- Release areas controlled
- Stop and safe-release process agreed
Use the separate sheet to document evidence, unresolved restrictions, correction owner, recheck and required release authority. Rebrief affected workers. This record does not replace specialist inspections, permits or engineering determinations.
Attendance and follow-through
Use the separate attendance record for participants, roles, questions, actions and late-arrival rebriefs. Attendance does not prove competence, functioning controls or authorization. Keep completed records private under employer procedures.
Source acknowledgment
HOP concepts are adapted from DOE-HDBK-1028-2009, Human Performance Improvement Handbook, Volume 2 (June 2009). Todd Jerome Jenkins makes no claim to authorship or copyright ownership of original U.S. Government work. The explanations and exercises are original adaptations; no endorsement by DOE or the U.S. Government is implied. Third-party material credited in the handbook retains its separate ownership.
HOP source: Volume 2/VOLUME 2 JOB-SITE REVIEW.pdf; PDF pp. 1–2; printed pp. 8–9. The handbook supplies concepts; task-specific technical references are listed below.
Technical scope and references
Technical sources inspected October 12, 2026; resource edition October 12, 2026. Apply current jurisdictional requirements, the actual task procedure, manufacturer instructions, permits and required competent or qualified decisions. This resource supplies no equipment-specific acceptance criteria.
- OSHA 29 CFR 1926.251 — Construction material-handling rigging; apply only within its scope.
- OSHA 29 CFR 1910.184 — General-industry hoisting slings; not every pulling or towing system.
- OSHA 29 CFR 1926.964 — Construction electric-power overhead-line installation/removal, (b); separate task-specific scope.
- DOE-HDBK-1028-2009 Volume 2 (June 2009) — Printed pp. 8–9; historical HOP concept, original adapted exercise.
Connect this discussion to your JHA/JSA
Use the JHA/JSA planning and field-verification worksheet to connect this discussion to the actual task, controls and responsible people.
Related Todd Jerome Jenkins articles: How to Conduct a Job Safety Analysis and What Is Human and Organizational Performance?.
Related toolbox talks
- Rigging: Before the Load Moves
- Energy Isolation: Verify Before Servicing
- Job-Site Review: Does the Place Match the Plan?
Continue the hazard series
Put one verification into practice
Record today’s change and evidence using the free JHA/JSA planning and field-verification worksheet.