Roof Truss Bundle Unloading and Staging JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Roof Truss Bundle Unloading and Staging JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Receive and identify the delivered bundle
Possible hazards: Unknown weight, damaged trusses or the wrong unloading orientation can defeat the lift plan.
Planned controls: Delivery lead matches the bundle and documents to the order, supplier handling information and crane plan. Inspect accessible components and shipping restraint from a safe position; document damage without climbing an unsecured load. Confirm bundle weight and pick arrangement with the supplier. Quarantine unidentified or damaged components pending a written disposition.
Check before work: Lead records bundle identification, supplied handling instructions and discrepancies before any restraint is disturbed.
022. Prepare ground storage and the unloading zone
Possible hazards: Weak bearing, blocked access or passing traffic can cause overturning or place people beneath the load.
Planned controls: Prepare the supplier-directed storage supports and restraint on accepted ground before unloading. Check alignment, drainage and access for later individual retrieval. Separate delivery traffic, crane operation and pedestrians; confirm the crane setup and travel envelope under its accepted plan. Keep people clear of the bundle’s potential roll, spread and suspended-load areas.
Check before work: Unloading lead verifies storage readiness, route clearance and the maintained exclusion boundary.
033. Coordinate rigging and transport-restraint release
Possible hazards: Removing the wrong tie can release the bundle; lifting bands can fail or damage trusses.
Planned controls: Qualified riggers fit the supplier-approved bundle lifting arrangement and check the actual rigging against the accepted lift plan. Coordinate with the carrier so only identified transport restraints are released at the planned hold point while bundle stability remains controlled. Do not lift by packaging bands or cut bundle bands during this transfer.
Check before work: Lead confirms which restraints will change state and who authorizes their release.
044. Lift and land the bundle
Possible hazards: A rotating bundle or uncontrolled landing can crush workers or damage unsupported trusses.
Planned controls: Use one designated signaler and the accepted controlled lift method, maintaining the exclusion zone throughout clearance and travel. Guide only from planned safe positions using the selected means; nobody rides, stands beneath or catches the load. Lower onto the prepared supports in the supplier-required orientation and stop for unexpected movement or contact.
Check before work: Signaler and receiving lead verify a clear path, stable landing and correct support contact.
055. Restrain storage before opening bands
Possible hazards: Releasing bands can spring packaging or allow individual trusses to lean and fall.
Planned controls: Complete and verify independent storage restraint before unloading rigging is released. For any later band opening, retain the bundle and the selected individual truss under the supplier-approved separation method before cutting an identified band. Stand outside recoil and fall paths, remove loose banding promptly and keep remaining trusses restrained throughout retrieval.
Check before work: Storage lead checks the restraints that remain effective after each planned band is opened.
066. Inspect and hand over the staged components
Possible hazards: Unreported handling damage or missing storage controls can carry a hazard into roof erection.
Planned controls: Inspect newly accessible trusses without entering an unstable stack. Record handling damage, identification, support arrangement and components held from use; obtain supplier disposition before repair or installation. Protect stored components under the actual handling guidance, keep access controlled and hand the erection crew the storage restrictions and accepted retrieval sequence.
Check before work: Lead records the staged condition and communicates holds to the installation supervisor.
Example scope and starting conditions
A delivery and framing crew will receive one identified wood roof-truss bundle, coordinate release of its transport securement, unload it by crane and establish supported ground storage. The supplier’s handling information and unloading plan govern bundle weight, lifting geometry, storage restraint and the later controlled opening of bands. Work ends before individual roof-truss erection. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The supplier identifies the bundle, weight, orientation, approved handling method and storage requirements; the actual crane/rigging plan and transport-securement sequence are accepted.
- Prepared ground storage has adequate bearing, supplier-directed support and independent stability restraint, with a controlled unloading route separated from traffic and people.
- The delivery/staging connection covers on-site receipt, unloading and bundle release; framing-material delivery is partial. Road transport, forklifts/telehandlers and roof erection are excluded.
Know when to pause
- Bundle identity, weight, handling information or support arrangement is missing, inconsistent or outside the accepted unloading plan.
- A restraint moves unexpectedly, packaging or a truss is damaged, the lifting arrangement shifts or a person enters the load boundary.
- Independent storage restraint is incomplete, weather exceeds the accepted limits or band opening would leave any component unstable.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- How will transport restraints be released without leaving the bundle unsupported or allowing trusses to spread?
- What supplier-approved lifting arrangement carries the bundle without treating its packaging bands as rigging?
- Which independent restraints remain effective when a selected storage band is cut?
Training and qualifications to confirm
- Component handling and storage instruction using the supplied current BCSI jobsite information, bundle identification and damage-reporting process.
- Crane-unloading roles, rigging/signal qualifications, controlled restraint release, band recoil and individual-truss retention before separation.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Where does this example end and the roof-truss installation example begin?
This example establishes accepted ground storage and a controlled component-release process. The published roof-truss example handles individual trusses at the building and completes erection restraint. An accepted bundle landing supplies neither the roof-bearing release nor the temporary/permanent bracing required for installation.
What must the crew record for actual use?
Record the work boundary, design/equipment documents, responsible people, acceptance criteria, control findings and unresolved actions. Communicate restrictions and obtain required project authorization. This learning example supplies no evidence that a control was installed or accepted.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Roof Trusses: Verify Restraint Before the Next Lift →Rigging: Before the Load Moves →Mobile Equipment: Separate People from Movement →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Receive and identify the delivered bundle
Hazard: Unknown weight, damaged trusses or the wrong unloading orientation can defeat the lift plan.
Control: Delivery lead matches the bundle and documents to the order, supplier handling information and crane plan. Inspect accessible components and shipping restraint from a safe position; document damage without climbing an unsecured load. Confirm bundle weight and pick arrangement with the supplier. Quarantine unidentified or damaged components pending a written disposition.
Verification: Lead records bundle identification, supplied handling instructions and discrepancies before any restraint is disturbed.
Why this belongs in the analysis: Packaging can conceal damage and does not establish a usable component.
2. Prepare ground storage and the unloading zone
Hazard: Weak bearing, blocked access or passing traffic can cause overturning or place people beneath the load.
Control: Prepare the supplier-directed storage supports and restraint on accepted ground before unloading. Check alignment, drainage and access for later individual retrieval. Separate delivery traffic, crane operation and pedestrians; confirm the crane setup and travel envelope under its accepted plan. Keep people clear of the bundle’s potential roll, spread and suspended-load areas.
Verification: Unloading lead verifies storage readiness, route clearance and the maintained exclusion boundary.
Why this belongs in the analysis: A successful lift needs a stable destination before the load leaves the trailer.
3. Coordinate rigging and transport-restraint release
Hazard: Removing the wrong tie can release the bundle; lifting bands can fail or damage trusses.
Control: Qualified riggers fit the supplier-approved bundle lifting arrangement and check the actual rigging against the accepted lift plan. Coordinate with the carrier so only identified transport restraints are released at the planned hold point while bundle stability remains controlled. Do not lift by packaging bands or cut bundle bands during this transfer.
Verification: Lead confirms which restraints will change state and who authorizes their release.
Why this belongs in the analysis: Transport securement, bundle bands and lifting rigging perform different functions.
4. Lift and land the bundle
Hazard: A rotating bundle or uncontrolled landing can crush workers or damage unsupported trusses.
Control: Use one designated signaler and the accepted controlled lift method, maintaining the exclusion zone throughout clearance and travel. Guide only from planned safe positions using the selected means; nobody rides, stands beneath or catches the load. Lower onto the prepared supports in the supplier-required orientation and stop for unexpected movement or contact.
Verification: Signaler and receiving lead verify a clear path, stable landing and correct support contact.
Why this belongs in the analysis: Long components can move and bend despite a slow crane movement.
5. Restrain storage before opening bands
Hazard: Releasing bands can spring packaging or allow individual trusses to lean and fall.
Control: Complete and verify independent storage restraint before unloading rigging is released. For any later band opening, retain the bundle and the selected individual truss under the supplier-approved separation method before cutting an identified band. Stand outside recoil and fall paths, remove loose banding promptly and keep remaining trusses restrained throughout retrieval.
Verification: Storage lead checks the restraints that remain effective after each planned band is opened.
Why this belongs in the analysis: A restraint being cut cannot also be the only restraint credited for stability.
6. Inspect and hand over the staged components
Hazard: Unreported handling damage or missing storage controls can carry a hazard into roof erection.
Control: Inspect newly accessible trusses without entering an unstable stack. Record handling damage, identification, support arrangement and components held from use; obtain supplier disposition before repair or installation. Protect stored components under the actual handling guidance, keep access controlled and hand the erection crew the storage restrictions and accepted retrieval sequence.
Verification: Lead records the staged condition and communicates holds to the installation supervisor.
Why this belongs in the analysis: Ground-storage acceptance does not release an individual truss for roof erection.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| The bundle is banded; hook the bands and unload it. | Use the supplier-approved lifting arrangement and confirmed bundle weight; keep packaging bands separate from crane rigging and coordinate transport-securement release. |
| It is on the ground, so cut all the bands. | Verify supported independently restrained storage, then retain the selected truss and remaining bundle before the planned band is opened. |
Common questions
Can this example be used as a JSA?
Adapt the Task | Hazard | Control sequence to the employer’s JSA and actual worksite. Name the control checkers and record findings; this fictional example supplies no completed inspection or authorization.
What changes if the project requires an AHA?
Use the governing AHA format, risk method, records and acceptance process. The published formwork AHA illustrates that structure. Add actual competencies, inspections and project reviews; renaming a JHA does not complete those requirements.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- SBCA BCSI 2025 guidance and jobsite documents
- SBCA longspan truss hoisting guidance: bundle handling and lifting bands
- OSHA 1926.251 Rigging equipment for material handling
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.