Engineer-Issued TJI Compression Flange Repair JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Engineer-Issued TJI Compression Flange Repair JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Confirm the specific repair applicability
Possible hazards: An unsuitable notch repair can conceal damage or transfer load through a product condition the bulletin does not cover.
Planned controls: Repair lead matches the identified single-ply floor joist and surveyed notch to the actual producer/engineer disposition. Confirm damage zone, loads, adjacent-member condition and all applicable bulletin limitations. Hold conflicting geometry, weathered material or additional damage for technical review; a downloaded repair table is not an approval for an unidentified joist.
Check before work: Lead records the matched member, current disposition and resolved applicability conditions.
022. Protect unloaded support and repair access
Possible hazards: Workers can fall, disturb support or load the damaged member while preparing a concealed joint.
Planned controls: Verify the separately accepted support and load-isolation state. Establish the released platform, access route and exclusion below; do not climb or stand on the joist. Prevent adjacent crews or stock from reloading the bay. Maintain visibility and safe tool reach to every required contact face and fastening point throughout installation.
Check before work: Lead verifies stable support, protected positions and effective loading restrictions.
033. Match prepared wood and bond surfaces
Possible hazards: Wrong reinforcement orientation or contaminated contact faces can prevent the intended bond and weaken the assembly.
Planned controls: Identify the specified prepared EWP reinforcement and predrilled screw arrangement against the issued detail. Check condition and fit without cutting a larger notch or forcing the joist. Prepare the accepted surfaces by the actual repair and adhesive method, keeping wood clean, dry and unweathered. Control any preparation residue; hold damaged faces or an unaccepted gap for disposition.
Check before work: Installer records reinforcement identity, orientation, fit and bond-face readiness.
044. Dispense the specified adhesive under control
Possible hazards: Uncured resin or hardener can injure skin and eyes or cause sensitization; incorrect dispensing can leave an incomplete bond.
Planned controls: Before opening or using adhesive, obtain and review actual supplied current SDS for both Six10 components; hold material use if either is missing. Use the exact Six10 cartridge, compatible applicator/static mixer and current instructions. Arrange ventilation, assessed chemical-resistant protection, washing and contained waste. Follow instructed dispensing and application to all specified contact surfaces. Do not substitute another adhesive, thin the product or use a curing nozzle’s resistance as a reason to force the gun.
Check before work: Operator checks material identity, dispenser condition and complete prescribed bond-face application.
055. Seat reinforcement and complete prescribed screws
Possible hazards: Wrong fastening order, poor seating or excess force can leave dry interfaces, split wood or trap fingers.
Planned controls: Install the prepared reinforcement in the actual detail’s screw sequence while the joist stays unloaded and supported. Use compatible tools and safe hand positions. Inspect required contact and squeeze-out evidence and all scheduled screw locations before concealment. Stop for splitting, failed seating or incomplete bond evidence; add no unscheduled screws or crew-selected clamping pressure.
Check before work: Named checker records interface engagement and required screw findings at the repair hold point.
066. Protect cure and transfer technical acceptance
Possible hazards: Early loading, contamination or an undocumented cure condition can activate a repair before its required release.
Planned controls: Maintain load isolation, support and the actual environmental protection through the governing repair and adhesive cure requirements. Record material, installation and cure observations; reconcile any conflicting instructions with the producer/engineer before release. Collect uncured waste without skin contact and transfer unresolved holds. A hard-looking bead or elapsed generic time is not structural acceptance or permission to remove support.
Check before work: Receiving lead confirms cure records, technical review status and continuing load restrictions.
Example scope and starting conditions
A specialist repair crew will install one producer/engineer-issued bonded reinforcement assembly at an inadvertent top-compression-flange notch in an identified single-ply TJI floor joist. The bay is unloaded and stably supported, with both bonding interfaces accessible from a released platform. Prepared specified wood reinforcement, WEST SYSTEM Six10 adhesive and prescribed screws form the repair; loading remains held through actual cure and technical acceptance. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The producer/engineer confirms current TB-832 applicability: one allowable compression-zone notch in a properly designed single-ply floor joist, uniform loading and undamaged adjacent joists. Roof joists, fire-resistance-rated assemblies and conditions outside the accepted repair are excluded.
- Current repair documents specify reinforcement identity/orientation, prepared geometry, holes, screws, adhesive and inspection/cure criteria. Clean, dry, unweathered bonding faces and protected access are required before material is dispensed. Before opening or using adhesive, verify actual supplied current SDS for both Six10 components; hold material use if either is missing.
- Framing-repair coverage is partial: this accepted top-flange bonded reinforcement only. New notch cutting, flange replacement, generic sistering, truss-plate pressing, adhesive substitution, structural diagnosis and shore removal are excluded.
Know when to pause
- Member identification, specific repair applicability, support/load isolation or exact materials cannot be confirmed.
- Bond faces are wet, weathered or contaminated, fit differs, screws split wood or dispensing/contact evidence is unacceptable.
- Cure conditions change, another adhesive is proposed or concealment/loading would occur before required checks and acceptance.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Which producer/engineer record confirms that this exact damage qualifies for the specified repair?
- How will the required bond faces and screw positions be inspected before concealment?
- What actual environmental and acceptance evidence keeps load off until the repair is released?
Training and qualifications to confirm
- Issued TJI repair-detail reading covering applicability, reinforcement orientation, specified adhesive, screw sequence and concealed bond checks.
- Two-part epoxy handling, compatible dispensing equipment, skin/eye exposure prevention, protected cure and loading-restriction handover.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Does this duplicate joist replacement or connector retrofit?
Joist replacement removes a damaged solid-sawn member. Connector retrofit adds metal hardware; the truss press embeds toothed plates. This repair bonds specified wood reinforcement at a qualified TJI compression-flange notch and requires bond and cure evidence. It supplies no general joist-repair design.
What must the crew record for actual use?
Record the actual work boundary, governing documents, responsible people, acceptance criteria, control findings and unresolved actions. Communicate restrictions and obtain required project authorization; this fictional example records no completed inspection or installed-control acceptance.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Epoxy Resins: Keep Uncured Material Off Skin →Hazard Communication: Labels, SDS & the Task →Fall Prevention: Verify the Controls →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Confirm the specific repair applicability
Hazard: An unsuitable notch repair can conceal damage or transfer load through a product condition the bulletin does not cover.
Control: Repair lead matches the identified single-ply floor joist and surveyed notch to the actual producer/engineer disposition. Confirm damage zone, loads, adjacent-member condition and all applicable bulletin limitations. Hold conflicting geometry, weathered material or additional damage for technical review; a downloaded repair table is not an approval for an unidentified joist.
Verification: Lead records the matched member, current disposition and resolved applicability conditions.
Why this belongs in the analysis: A proprietary contingency repair is bounded to its stated product and damage conditions.
2. Protect unloaded support and repair access
Hazard: Workers can fall, disturb support or load the damaged member while preparing a concealed joint.
Control: Verify the separately accepted support and load-isolation state. Establish the released platform, access route and exclusion below; do not climb or stand on the joist. Prevent adjacent crews or stock from reloading the bay. Maintain visibility and safe tool reach to every required contact face and fastening point throughout installation.
Verification: Lead verifies stable support, protected positions and effective loading restrictions.
Why this belongs in the analysis: Bond preparation is unsafe if the member’s load state can change unnoticed.
3. Match prepared wood and bond surfaces
Hazard: Wrong reinforcement orientation or contaminated contact faces can prevent the intended bond and weaken the assembly.
Control: Identify the specified prepared EWP reinforcement and predrilled screw arrangement against the issued detail. Check condition and fit without cutting a larger notch or forcing the joist. Prepare the accepted surfaces by the actual repair and adhesive method, keeping wood clean, dry and unweathered. Control any preparation residue; hold damaged faces or an unaccepted gap for disposition.
Verification: Installer records reinforcement identity, orientation, fit and bond-face readiness.
Why this belongs in the analysis: Adhesive cannot compensate for an unaccepted reinforcement or substrate condition.
4. Dispense the specified adhesive under control
Hazard: Uncured resin or hardener can injure skin and eyes or cause sensitization; incorrect dispensing can leave an incomplete bond.
Control: Before opening or using adhesive, obtain and review actual supplied current SDS for both Six10 components; hold material use if either is missing. Use the exact Six10 cartridge, compatible applicator/static mixer and current instructions. Arrange ventilation, assessed chemical-resistant protection, washing and contained waste. Follow instructed dispensing and application to all specified contact surfaces. Do not substitute another adhesive, thin the product or use a curing nozzle’s resistance as a reason to force the gun.
Verification: Operator checks material identity, dispenser condition and complete prescribed bond-face application.
Why this belongs in the analysis: The repair’s specified adhesive system is part of its technical basis.
5. Seat reinforcement and complete prescribed screws
Hazard: Wrong fastening order, poor seating or excess force can leave dry interfaces, split wood or trap fingers.
Control: Install the prepared reinforcement in the actual detail’s screw sequence while the joist stays unloaded and supported. Use compatible tools and safe hand positions. Inspect required contact and squeeze-out evidence and all scheduled screw locations before concealment. Stop for splitting, failed seating or incomplete bond evidence; add no unscheduled screws or crew-selected clamping pressure.
Verification: Named checker records interface engagement and required screw findings at the repair hold point.
Why this belongs in the analysis: Visible screw heads alone cannot establish the concealed bonded assembly.
6. Protect cure and transfer technical acceptance
Hazard: Early loading, contamination or an undocumented cure condition can activate a repair before its required release.
Control: Maintain load isolation, support and the actual environmental protection through the governing repair and adhesive cure requirements. Record material, installation and cure observations; reconcile any conflicting instructions with the producer/engineer before release. Collect uncured waste without skin contact and transfer unresolved holds. A hard-looking bead or elapsed generic time is not structural acceptance or permission to remove support.
Verification: Receiving lead confirms cure records, technical review status and continuing load restrictions.
Why this belongs in the analysis: The completed joint remains held until its actual acceptance process is satisfied.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Any construction adhesive and sister board will do. | Match the specific producer/engineer repair, prepared reinforcement, Six10 system and prescribed screws. |
| The epoxy bead feels hard; remove the support. | Maintain unloaded support through actual cure evidence and designated technical acceptance; support removal is separately released. |
Common questions
Can this example be used as a JSA?
Adapt the Task | Hazard | Control sequence to the employer’s JSA and actual worksite. Name control checkers and record findings; this fictional example supplies no completed inspection or authorization.
What changes if the project requires an AHA?
Use the governing AHA format, risk method, records and acceptance process. The published formwork AHA illustrates that structure. Add actual competencies, inspections and reviews; renaming a JHA does not complete them.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- Weyerhaeuser TB-832: top compression-flange repair, May 2025
- WEST SYSTEM Six10 adhesive and current instructions
- WEST SYSTEM current component safety-data-sheet library
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 13, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.