Welding and Cutting JSA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Welding and Cutting JSA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
01Confirm material and work boundaries
Possible hazards: An unidentified coating or residue releases hazardous contaminants when heated; a nearby flammable process ignites.
Planned controls: The supervisor verifies the material and process information before selecting controls. Move hot work to the designated station. Stop when material identity or previous contents are unknown.
Check before work: Identify the material record and inspect both the workpiece and surrounding operations; resolve discrepancies before hot work.
02Prepare the fire-control area
Possible hazards: Sparks, slag, or conducted heat reach packaging, hidden openings, or people beyond the visible workface.
Planned controls: Remove movable combustibles; protect remaining exposures with suitable barriers. Examine openings and opposite surfaces. Assign a trained fire watch where normal precautions are insufficient and make suitable extinguishing equipment immediately available.
Check before work: The supervisor and fire watch walk the exposure area, identify alarm and evacuation actions, and record the required watch and follow-up periods.
03Set up welding and gas equipment
Possible hazards: Damaged leads cause electric shock; a falling cylinder or leaking hose releases fuel or oxygen.
Planned controls: Inspect leads, holders, return connections, hoses, regulators, and torches. Remove defective items. Secure cylinders upright and protect them from heat and impact. Keep oxygen equipment free of oil and grease; route leads and hoses away from traffic.
Check before work: The operator checks the specific equipment instructions and verifies safe isolation and shutdown methods before connection.
04Establish fume, radiation, and personal protection
Possible hazards: Fumes enter breathing zones; the arc or hot metal burns eyes and skin of workers and passersby.
Planned controls: Select ventilation from the material/process exposure assessment; position source capture when needed without directing contaminants at others. Install welding screens. Select appropriate filter shade, eye protection, gloves, protective clothing, and hearing protection. Use respirators only through the required respiratory-protection program.
Check before work: The designated exposure assessor confirms control selection; operators verify screen coverage and ventilation performance using the established assessment method.
05Cut and weld the secured workpiece
Possible hazards: Unsupported offcuts fall, hands enter pinch points, or changing conditions defeat the fire and fume controls.
Planned controls: Support and restrain the workpiece and offcuts before cutting. Keep people outside the spark and drop zones. Maintain the selected controls throughout work; stop for a gas leak, failed extraction, encroachment, or unsafe weather.
Check before work: The operator checks supports before each cut and confirms fire-watch availability and protection of adjacent workers.
06Shut down and close the hot work
Possible hazards: Residual heat ignites concealed material after departure; hot steel burns another worker; gas remains available at damaged equipment.
Planned controls: Shut equipment down using its instructions, close cylinder valves, and secure the station. Mark or segregate hot pieces. Continue the assigned watch and follow-up inspection for the period required by conditions, the permit, and applicable rules.
Check before work: The responsible person records the actual shutdown, watch completion, inspection findings, and unresolved conditions; do not prefill a clearance.
Example scope and starting conditions
Fictional example: a construction crew will cut new, identified uncoated mild-steel brackets with oxy-fuel equipment, then weld them at a ground-level outdoor fabrication station. A delivery route and combustible packaging are nearby. The work excludes vessels, used containers, structural demolition, confined spaces, and unknown coatings. No inspection or permit has been completed by this example; the responsible supervisor must establish the actual conditions before authorizing work.
- Record the welding process, base metal, filler, coatings, equipment models, and applicable safety data sheets. A change to galvanized or stainless material requires reassessment.
- The station has a firm working surface and an exclusion area that can keep deliveries, pedestrians, and other trades outside the hot-work exposure.
- Identify the hot-work authorization process, trained operators, fire-watch coverage, suitable extinguishers, emergency contact method, and the person responsible for closing the work.
- Outdoor air movement is variable. The exposure assessment must consider nearby workers as well as the welder; being outside does not establish adequate fume control.
Know when to pause
- Pause for a different alloy/coating, enclosure, ventilation failure, flammable process, or unknown container history.
- Reassess when sparks can reach another level, the watch is relieved, or weather changes the work area.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Decisions that change the plan
A painted bracket arrives. Can the crew use this example unchanged?
Stop and identify the coating and exposure implications. Confirm removal or other controls before revising the analysis.
The fire watch is called elsewhere. What happens?
Suspend work that depends on that watch until a trained replacement receives the handover and required coverage is restored.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Hot Work: Verify the Area and Fire Watch →Gas Cylinders: Identify, Secure and Check →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
Confirm material and work boundaries
Hazard: An unidentified coating or residue releases hazardous contaminants when heated; a nearby flammable process ignites.
Control: The supervisor verifies the material and process information before selecting controls. Move hot work to the designated station. Stop when material identity or previous contents are unknown.
Verification: Identify the material record and inspect both the workpiece and surrounding operations; resolve discrepancies before hot work.
Why this belongs in the analysis: The same torch can create very different exposures on clean steel, coated steel, and a used container.
Prepare the fire-control area
Hazard: Sparks, slag, or conducted heat reach packaging, hidden openings, or people beyond the visible workface.
Control: Remove movable combustibles; protect remaining exposures with suitable barriers. Examine openings and opposite surfaces. Assign a trained fire watch where normal precautions are insufficient and make suitable extinguishing equipment immediately available.
Verification: The supervisor and fire watch walk the exposure area, identify alarm and evacuation actions, and record the required watch and follow-up periods.
Why this belongs in the analysis: A clear tabletop is insufficient when hot particles or heat can travel beyond it.
Set up welding and gas equipment
Hazard: Damaged leads cause electric shock; a falling cylinder or leaking hose releases fuel or oxygen.
Control: Inspect leads, holders, return connections, hoses, regulators, and torches. Remove defective items. Secure cylinders upright and protect them from heat and impact. Keep oxygen equipment free of oil and grease; route leads and hoses away from traffic.
Verification: The operator checks the specific equipment instructions and verifies safe isolation and shutdown methods before connection.
Why this belongs in the analysis: An equipment inspection connects the generic JSA to the actual machine and gas set being used.
Establish fume, radiation, and personal protection
Hazard: Fumes enter breathing zones; the arc or hot metal burns eyes and skin of workers and passersby.
Control: Select ventilation from the material/process exposure assessment; position source capture when needed without directing contaminants at others. Install welding screens. Select appropriate filter shade, eye protection, gloves, protective clothing, and hearing protection. Use respirators only through the required respiratory-protection program.
Verification: The designated exposure assessor confirms control selection; operators verify screen coverage and ventilation performance using the established assessment method.
Why this belongs in the analysis: A helmet protects the wearer from the arc but does not establish protection against airborne contaminants.
Cut and weld the secured workpiece
Hazard: Unsupported offcuts fall, hands enter pinch points, or changing conditions defeat the fire and fume controls.
Control: Support and restrain the workpiece and offcuts before cutting. Keep people outside the spark and drop zones. Maintain the selected controls throughout work; stop for a gas leak, failed extraction, encroachment, or unsafe weather.
Verification: The operator checks supports before each cut and confirms fire-watch availability and protection of adjacent workers.
Why this belongs in the analysis: Securing an offcut before separation prevents an otherwise predictable falling-object event.
Shut down and close the hot work
Hazard: Residual heat ignites concealed material after departure; hot steel burns another worker; gas remains available at damaged equipment.
Control: Shut equipment down using its instructions, close cylinder valves, and secure the station. Mark or segregate hot pieces. Continue the assigned watch and follow-up inspection for the period required by conditions, the permit, and applicable rules.
Verification: The responsible person records the actual shutdown, watch completion, inspection findings, and unresolved conditions; do not prefill a clearance.
Why this belongs in the analysis: The JSA continues after the arc stops because the ignition source may persist.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Fire: have an extinguisher. | Trace where sparks and heat can travel, remove combustibles, assign necessary watch coverage, and verify extinguishing readiness. |
| Fumes: wear a mask. | Identify the metal and process, assess exposure, select ventilation, and determine whether a respiratory-protection program is needed. |
Common questions
Is a 30-minute fire watch always enough?
No. Federal construction rule 1926.352(e) requires a sufficient period after work to address the fire possibility; permits, adopted fire codes, and site conditions can require more. Establish and record the applicable period.
Does this replace a hot-work permit?
No. It explains the task hazards and planned controls. Complete any required permit and equipment-specific procedure separately, then cross-reference them in the site analysis.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- OSHA 1926.350: Gas welding and cutting
- OSHA 1926.351: Arc welding and cutting
- OSHA 1926.352: Fire prevention
- OSHA 1926.353: Ventilation and protection
This original walkthrough was informed by review of uploaded examples, then rewritten for the stated fictional scenario using current primary references. It does not reproduce a source document or its approval record. Use actual equipment instructions and site requirements alongside these references. Reference review: October 6, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 6, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.