Broken Glass Removal JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Broken Glass Removal JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Assess from a protected position
Possible hazards: Cracked glass can release suddenly or conceal loose fragments.
Planned controls: Glazing lead identifies the glass type, retained support and damage from outside the potential fall area. Obtain technical help when the removal method is uncertain.
Check before work: Record the assessed support and planned removal sequence before approach.
022. Isolate both sides
Possible hazards: Falling fragments can cut workers or people beyond the opening.
Planned controls: Separate the opening and fragment area on both sides, coordinate adjacent access and prepare a stable temporary opening protection.
Check before work: Lead confirms the boundary and protection materials before removal.
033. Prepare support and collection
Possible hazards: Sharp material or unsuitable handling devices can injure the crew.
Planned controls: Use support and removal tools suitable for the damaged pane; do not rely on suction equipment unless its instructions permit the actual condition. Select assessed cut, eye, face and body protection.
Check before work: Lead checks the planned devices, protective equipment and puncture-resistant collection containers.
044. Remove in the assessed sequence
Possible hazards: Releasing a retainer can cause uncontrolled glass movement.
Planned controls: Follow the supported removal sequence from designated positions, keep hands out of fragment paths and maintain the boundary. Stop for unexpected movement or a loss of support.
Check before work: Lead monitors support as each retainer or section is released.
055. Collect fragments without hand sorting
Possible hazards: Shards can puncture gloves or cut workers through unsuitable bags.
Planned controls: Use appropriate collection tools and rigid or otherwise suitable identified containers. Keep sharp waste separated and use the site disposal method; never compact shards by hand.
Check before work: Crew checks surfaces, frame channels and waste containment from safe positions.
066. Secure and hand over the opening
Possible hazards: Remaining shards or an open frame can expose occupants and later crews.
Planned controls: Install the required temporary protection, identify remaining glass and frame defects, and maintain access restrictions until the designated release.
Check before work: Lead checks both sides and communicates the opening status.
Example scope and starting conditions
A glazing crew will remove damaged glass from a released ground-level storefront opening in an unoccupied work zone, secure the opening and collect fragments. This fictional learning example records planned controls; it supplies no actual inspections or work authorization.
- Glass type, damage pattern, retained support and removal method are assessed before anyone approaches.
- Both sides of the opening and the potential fragment area can be isolated.
- This excludes elevated glass, unstable structural framing and emergency work in an occupied public route.
Know when to pause
- Support or glass type is uncertain.
- Cracks, movement or retained fragments change unexpectedly.
- The boundary, removal support or waste containers are unsuitable.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- What retains the damaged pane and how will it be supported?
- How far can fragments reach on both sides of the opening?
- Which collection tools and containers avoid hand contact with shards?
Training and qualifications to confirm
- Damaged-glass support and removal sequence.
- Fragment collection, container handling and bleeding-response readiness.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Do cut-resistant gloves make hand pickup acceptable?
No. Gloves have task-specific limits and cannot make every sharp edge safe. Use collection tools and suitable containers to reduce direct contact.
What must be recorded before this example is used on a job?
Replace the scenario with the actual work, identify additional hazards with the crew, and record the applicable instructions, responsible people, inspection findings, unresolved actions and required authorization. A planned verification is not an inspection result.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Hand Protection: Match the Glove to the Task →Eye & Face Protection →Severe Bleeding: Check Response Readiness →Broken Glass Cleanup: Protect the Next Person Too →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Assess from a protected position
Hazard: Cracked glass can release suddenly or conceal loose fragments.
Control: Glazing lead identifies the glass type, retained support and damage from outside the potential fall area. Obtain technical help when the removal method is uncertain.
Verification: Record the assessed support and planned removal sequence before approach.
Why this belongs in the analysis: Visible cracks do not establish how the pane will fail.
2. Isolate both sides
Hazard: Falling fragments can cut workers or people beyond the opening.
Control: Separate the opening and fragment area on both sides, coordinate adjacent access and prepare a stable temporary opening protection.
Verification: Lead confirms the boundary and protection materials before removal.
Why this belongs in the analysis: A one-sided boundary leaves a second exposure path.
3. Prepare support and collection
Hazard: Sharp material or unsuitable handling devices can injure the crew.
Control: Use support and removal tools suitable for the damaged pane; do not rely on suction equipment unless its instructions permit the actual condition. Select assessed cut, eye, face and body protection.
Verification: Lead checks the planned devices, protective equipment and puncture-resistant collection containers.
Why this belongs in the analysis: Damage may invalidate a normal glass-handling method.
4. Remove in the assessed sequence
Hazard: Releasing a retainer can cause uncontrolled glass movement.
Control: Follow the supported removal sequence from designated positions, keep hands out of fragment paths and maintain the boundary. Stop for unexpected movement or a loss of support.
Verification: Lead monitors support as each retainer or section is released.
Why this belongs in the analysis: Every release changes what holds the remaining glass.
5. Collect fragments without hand sorting
Hazard: Shards can puncture gloves or cut workers through unsuitable bags.
Control: Use appropriate collection tools and rigid or otherwise suitable identified containers. Keep sharp waste separated and use the site disposal method; never compact shards by hand.
Verification: Crew checks surfaces, frame channels and waste containment from safe positions.
Why this belongs in the analysis: Protection must cover small fragments as well as the main pane.
6. Secure and hand over the opening
Hazard: Remaining shards or an open frame can expose occupants and later crews.
Control: Install the required temporary protection, identify remaining glass and frame defects, and maintain access restrictions until the designated release.
Verification: Lead checks both sides and communicates the opening status.
Why this belongs in the analysis: Removal is incomplete until the opening and waste are controlled.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Be careful around the equipment. | Use support and removal tools suitable for the damaged pane; do not rely on suction equipment unless its instructions permit the actual condition. Select assessed cut, eye, face and body protection. |
| Check the area before starting. | Glazing lead identifies the glass type, retained support and damage from outside the potential fall area. Obtain technical help when the removal method is uncertain. |
Common questions
Can this be used as a JSA?
Use the Task | Hazard | Control structure if it meets the employer’s format. Adapt the boundaries, controls, verification and records to the actual job.
Does this provide a completed USACE AHA?
No. Use the project’s required AHA process, risk method, supporting fields and acceptance requirements. The existing formwork AHA explains the additional structure.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
Original worked example developed for the stated scenario. Primary references support the planning framework; the actual equipment manual, product instructions and project design must supply applicable operating and acceptance criteria. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 9, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.