Concrete Pouring JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Concrete Pouring JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
01Confirm the pour area and supporting arrangements
Possible hazards: Unexpected form movement, an unprotected opening, or protruding reinforcement can cause crushing, falls, or impalement during placement.
Planned controls: The supervisor compares the actual work area with the placement and formwork plans, confirms required release checks, and resolves missing braces, unsafe access, and impalement protection before calling trucks forward. Where erected shoring is involved, include inspections immediately before, during, and after placement under 1926.703(b)(3).
Check before work: Identify the specific pour area, approved sequence, protected access, and unresolved defects; leave the start decision with the responsible project personnel.
02Receive and position each delivery truck
Possible hazards: A reversing mixer can strike a pedestrian or trap a person between the mixer, pump, and fixed objects.
Planned controls: Separate pedestrians from the delivery lane and holding area. Assign a trained observer for the planned reversing movement, agree signals, and stop if communication or visibility is lost. Keep everyone out of the space between approaching equipment. The driver controls the mixer and chute using the manufacturer's procedure.
Check before work: Walk the route with the driver and observer; confirm the stopping point and a position where the observer cannot be trapped.
03Prepare the pump, line, and discharge area
Possible hazards: Inadequate support, damaged connections, or air and pressure in the delivery system can cause equipment movement or hose whip.
Planned controls: Have the trained pump crew verify setup, pipe supports, connections, guards, and hose configuration against the equipment instructions. Establish the exclusion area for priming and restart. Keep unnecessary personnel clear; the designated signaler coordinates flow. A blockage triggers the operator's shutdown and pressure-release procedure, not opening a charged connection.
Check before work: Ask the hose crew to show where they stand during priming and what signal immediately stops the pump.
04Place and distribute wet concrete
Possible hazards: The hose can pull workers off balance; wet concrete trapped against skin can cause chemical burns and eye injury.
Planned controls: Use the planned crew and hose-handling method, keep the route clear, and maintain communication as the pour advances. Avoid direct skin contact using suitable waterproof boots, cement-resistant gloves and clothing, and splash eye protection. Stop to remove contaminated clothing and wash exposed skin promptly; follow the SDS and first-aid procedure rather than waiting for pain.
Check before work: Confirm clean water is reachable and that concrete cannot readily enter gloves or boots during the planned movements.
05Consolidate concrete and monitor the placement
Possible hazards: Damaged electrical tools in a wet area, trailing leads, and an advancing pour can expose workers to shock, trips, or unstable formwork.
Planned controls: Use suitable inspected equipment and the site's required electrical protection; route leads away from water and traffic. Follow the planned consolidation method and placement rate. Assign monitoring of forms and supports from a protected position. Stop placement for movement, distress, lost access, or equipment defects and obtain the responsible person's assessment.
Check before work: Verify who watches the forms and who can stop the pump without waiting for the next truck to finish.
06Shut down, wash out, and hand over the slab
Possible hazards: Residual pressure, moving mixer parts, cement slurry, and abandoned hoses can injure workers after placement ends.
Planned controls: The equipment operator controls shutdown and cleaning under the manufacturer's procedure. Isolate hazardous energy before maintenance or repair. Use the designated contained washout area, keep bystanders away, and remove slurry and trip hazards without spreading cement contamination. Protect the curing area and hand over remaining restrictions to the finishing crew.
Check before work: Confirm the line is safe before disconnection and that the next crew understands access and loading restrictions.
Example scope and starting conditions
This fictional example follows a crew placing a reinforced slab on grade outdoors at a new building. Ready-mix trucks feed a stationary concrete pump from a controlled delivery lane. Workers guide the discharge hose, distribute the concrete, and consolidate it. Forms and reinforcement have separate installation analyses. Excavations, suspended slabs, post-tensioning, overhead bucket placement, and powered finishing are outside this example. The completed rows explain a planning method; the contractor still establishes the actual pump arrangement, placement limits, equipment procedures, and authority to start.
- Confirm ground bearing conditions and nearby buried services before choosing pump, outrigger, truck, and washout locations. A flat-looking surface is not evidence of adequate support.
- Identify overhead electrical hazards, adjacent work, public access, the crew's escape routes, and where delivery vehicles can wait without obstructing emergency access.
- Use the actual mix safety data sheet, pump instructions, formwork plans, and placement sequence. Identify who can stop deliveries and who communicates with the pump operator.
- Provide clean washing water, suitable cement-resistant clothing and gloves, splash protection, and a workable response to contaminated boots or clothing before concrete arrives.
Know when to pause
- Pause for a relocated pump, different hose or mix, altered ground support, loss of communication, or an unexpected delivery route.
- Reassess for form movement, new openings, electrical exposure, rising heat stress, lightning, or washing supplies becoming unavailable.
- Add separate analyses if the work changes to elevated concrete, deep footings, bucket placement, or powered finishing.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Decisions that change the plan
The pump hose stops discharging. Should the crew loosen a coupling?
No. Stop and use the pump operator's blockage procedure, including controlling stored pressure and exclusion of exposed workers. This walkthrough does not teach blockage clearance.
The form begins moving while another truck is waiting. What takes priority?
Stop placement, clear exposed personnel, and have the responsible project personnel evaluate the formwork. Truck waiting time does not justify continuing.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Concrete Pumps and Hoses: Verify Before Flow →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
Confirm the pour area and supporting arrangements
Hazard: Unexpected form movement, an unprotected opening, or protruding reinforcement can cause crushing, falls, or impalement during placement.
Control: The supervisor compares the actual work area with the placement and formwork plans, confirms required release checks, and resolves missing braces, unsafe access, and impalement protection before calling trucks forward. Where erected shoring is involved, include inspections immediately before, during, and after placement under 1926.703(b)(3).
Verification: Identify the specific pour area, approved sequence, protected access, and unresolved defects; leave the start decision with the responsible project personnel.
Why this belongs in the analysis: A delivery schedule cannot establish structural readiness. Workers need a defined route and a stable system before wet concrete adds load.
Receive and position each delivery truck
Hazard: A reversing mixer can strike a pedestrian or trap a person between the mixer, pump, and fixed objects.
Control: Separate pedestrians from the delivery lane and holding area. Assign a trained observer for the planned reversing movement, agree signals, and stop if communication or visibility is lost. Keep everyone out of the space between approaching equipment. The driver controls the mixer and chute using the manufacturer's procedure.
Verification: Walk the route with the driver and observer; confirm the stopping point and a position where the observer cannot be trapped.
Why this belongs in the analysis: High-visibility clothing helps recognition, but physical separation and controlled movement address the vehicle's path.
Prepare the pump, line, and discharge area
Hazard: Inadequate support, damaged connections, or air and pressure in the delivery system can cause equipment movement or hose whip.
Control: Have the trained pump crew verify setup, pipe supports, connections, guards, and hose configuration against the equipment instructions. Establish the exclusion area for priming and restart. Keep unnecessary personnel clear; the designated signaler coordinates flow. A blockage triggers the operator's shutdown and pressure-release procedure, not opening a charged connection.
Verification: Ask the hose crew to show where they stand during priming and what signal immediately stops the pump.
Why this belongs in the analysis: The discharge system contains stored energy. Normal placement positions may be unsafe during priming or a blockage.
Place and distribute wet concrete
Hazard: The hose can pull workers off balance; wet concrete trapped against skin can cause chemical burns and eye injury.
Control: Use the planned crew and hose-handling method, keep the route clear, and maintain communication as the pour advances. Avoid direct skin contact using suitable waterproof boots, cement-resistant gloves and clothing, and splash eye protection. Stop to remove contaminated clothing and wash exposed skin promptly; follow the SDS and first-aid procedure rather than waiting for pain.
Verification: Confirm clean water is reachable and that concrete cannot readily enter gloves or boots during the planned movements.
Why this belongs in the analysis: Cement burns may develop without immediate discomfort; finishing the truck before washing is not a protective control.
Consolidate concrete and monitor the placement
Hazard: Damaged electrical tools in a wet area, trailing leads, and an advancing pour can expose workers to shock, trips, or unstable formwork.
Control: Use suitable inspected equipment and the site's required electrical protection; route leads away from water and traffic. Follow the planned consolidation method and placement rate. Assign monitoring of forms and supports from a protected position. Stop placement for movement, distress, lost access, or equipment defects and obtain the responsible person's assessment.
Verification: Verify who watches the forms and who can stop the pump without waiting for the next truck to finish.
Why this belongs in the analysis: Monitoring needs an owner and a response. Writing 'watch forms' without a stop action leaves the hazard unresolved.
Shut down, wash out, and hand over the slab
Hazard: Residual pressure, moving mixer parts, cement slurry, and abandoned hoses can injure workers after placement ends.
Control: The equipment operator controls shutdown and cleaning under the manufacturer's procedure. Isolate hazardous energy before maintenance or repair. Use the designated contained washout area, keep bystanders away, and remove slurry and trip hazards without spreading cement contamination. Protect the curing area and hand over remaining restrictions to the finishing crew.
Verification: Confirm the line is safe before disconnection and that the next crew understands access and loading restrictions.
Why this belongs in the analysis: The job ends when stored energy, contamination, and interface hazards are controlled, not when the last concrete leaves the truck.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Concrete trucks: wear a vest. | Barricade the delivery lane, assign the reversing observer, and stop truck movement when the observer is not visible. |
| Wet concrete: wear gloves. | Select cement-resistant gloves and boots, prevent concrete entering them, provide nearby washing water, and stop to remove contamination promptly. |
Common questions
Does this concrete pouring JHA cover all concrete work?
No. It covers the stated pumped slab-on-grade scenario. Form erection, excavation, suspended slabs, and finishing have different hazards and need their own linked analyses.
Can I use the example as a concrete pouring JSA?
Yes, as a starting structure for task, hazard, and control discussion. Replace every scenario assumption with site facts and complete the employer's review and authorization process.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- OSHA 1926.703 — Cast-in-place concrete and shoring
- OSHA 1926.702 — Concrete equipment and hazardous energy
- OSHA — Preventing Skin Problems from Working with Portland Cement
- OSHA 1926.601 — Construction motor vehicles
This original walkthrough was informed by review of uploaded examples, then rewritten for the stated fictional scenario using current primary references. It does not reproduce a source document or its approval record. Use actual equipment instructions and site requirements alongside these references. Reference review: October 6, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 6, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.