Metal Deck Arc Spot Welding JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Metal Deck Arc Spot Welding JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Release the deck attachment operation
Possible hazards: Wrong weld details or an assumed welder qualification can produce unsafe attachments while exposing workers to an unstable deck.
Planned controls: Deck lead identifies the released deck/support area, current attachment drawing and applicable procedure. Verify the required deck arc-spot welder qualification and acceptance roles. Resolve missing details or uncertain work-surface status before production welding.
Check before work: Lead matches the deck area, procedure, qualification evidence and work-surface release to the attachment plan.
022. Establish the hot-work and fall controls
Possible hazards: Heat or sparks passing through the deck can ignite material below, while unprotected edges expose the welder to a fall.
Planned controls: Complete the hot-work review above, below and along concealed paths. Remove or protect combustibles, assign fire watch and prepare response equipment. Maintain edge/opening protection, access and screens; confirm known-coating, ventilation and assessed protection arrangements.
Check before work: Hot-work lead and deck lead verify the upper and lower boundaries and each assigned protection role.
033. Prepare equipment and weld fit-up
Possible hazards: Damaged leads, unsuitable return contact or a gap at the support can cause shock, arcing elsewhere or an unaccepted attachment.
Planned controls: Welder checks equipment, insulated holder, cables and grounding under actual instructions. Route leads safely and establish the specified return path. Verify deck-to-support contact and attachment details, including washers only when specified; refer gaps or changed materials before welding.
Check before work: Welder records equipment and fit-up findings, and the lead resolves unaccepted attachment conditions.
044. Complete the specified arc-spot attachments
Possible hazards: Arc exposure, fume accumulation or incorrect weld formation can injure workers and leave inadequate deck attachment.
Planned controls: Qualified welder follows the accepted welding procedure and attachment layout with screens, ventilation and fire controls operating. Maintain a protected stance and cable route; monitor actual attachment conditions. Stop for changed fit-up, burn-through, abnormal equipment response or an ineffective exposure control rather than improvising weld time or machine settings.
Check before work: Welder checks completed locations against the layout and reports questionable welds to the assigned reviewer.
055. Review connections and resolve defects
Possible hazards: An incomplete attachment pattern or cosmetic repair can conceal a connection that has not met its acceptance criteria.
Planned controls: Assigned reviewer performs required connection checks and records findings by location. Preserve area restrictions while discrepancies receive an accepted repair method. Qualified personnel complete authorized corrections under the applicable procedure and repeat required checks before handover.
Check before work: Reviewer records completed, unaccepted and corrected locations and communicates any remaining hold to the deck lead.
066. Close out welding and hand over restrictions
Possible hazards: Residual heat, an unattended electrode or assumed deck-load permission can create hazards after the welder leaves.
Planned controls: Welder shuts down and secures equipment using its instructions and removes hot debris safely. Fire watch completes the site’s required continuing observations and closeout, including the underside. Record connection-review status and transfer remaining load and access limits to the receiving lead; concrete placement remains a separate release.
Check before work: Hot-work lead records actual monitoring closeout and deck lead confirms unresolved connection and loading restrictions.
Example scope and starting conditions
A qualified deck welder will complete specified arc-spot, or puddle-weld, attachments between installed building-floor metal deck and steel supports. The deck is independently secured and released as the protected work surface. Current attachment and welding documents govern work through connection review and hot-work closeout, before subsequent loading. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- Current drawings identify deck, supports, weld locations and details. The lead verifies the applicable welding procedure and deck arc-spot qualification; frame-welding experience alone does not establish qualification for this operation.
- Deck stability, protected access and openings are ready. The employer resolves known coatings and fumes, required ventilation and protection, and fire exposure above, beneath and in concealed spaces.
- This is partial coverage of deck fastening 238120-10 and field welding 238120-08. Deck placement, mechanical fasteners, headed studs, frame welds, unknown coatings and controlled-decking-zone welding are excluded.
Know when to pause
- Deck security, access, fall protection or the actual attachment drawing and procedure cannot be verified for the planned area.
- Fit-up, material, coating, weld formation, equipment or ventilation differs from the accepted conditions.
- Fire watch loses access to affected areas, combustibles enter the boundary, or heat and sparks reach an uncontrolled location.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Which current attachment detail and applicable procedure define this deck-to-support weld and its acceptance checks?
- Who verifies deck stability and protection, and who can inspect fire exposure beneath or beyond the weld area?
- How are actual coating and ventilation conditions resolved before welding, and what stops work if they change?
Training and qualifications to confirm
- Deck arc-spot qualification and procedure instruction on contact, specified washer details, weld formation, defect recognition and authorized correction.
- Hot-work instruction on underside and concealed fire exposure, screens, electrical equipment, fumes and required fire-watch and post-work monitoring duties.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Is an arc-spot weld the same as a headed shear-stud weld?
No. Arc-spot welding attaches thin deck to supports using its accepted sheet-steel procedure. Headed studs use a separate gun/ferrule process; frame welds and mechanical deck fasteners also differ. No universal washer, weld size, current or time establishes acceptance.
What must the crew record for actual use?
Record the deck area and attachment drawing, applicable welding procedure, qualification evidence, actual fit-up and equipment findings, known-coating and exposure-control basis, upper and lower hot-work boundaries and fire-watch assignments. Record connection locations, acceptance findings, repair dispositions, monitoring closeout and remaining deck-load or access restrictions.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Hot Work: Verify the Area and Fire Watch →Electrical & Extension-Cord Checks →Fall Prevention: Verify the Controls →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Release the deck attachment operation
Hazard: Wrong weld details or an assumed welder qualification can produce unsafe attachments while exposing workers to an unstable deck.
Control: Deck lead identifies the released deck/support area, current attachment drawing and applicable procedure. Verify the required deck arc-spot welder qualification and acceptance roles. Resolve missing details or uncertain work-surface status before production welding.
Verification: Lead matches the deck area, procedure, qualification evidence and work-surface release to the attachment plan.
Why this belongs in the analysis: Mechanical deck attachment and ordinary frame-weld experience do not establish this operation’s readiness.
2. Establish the hot-work and fall controls
Hazard: Heat or sparks passing through the deck can ignite material below, while unprotected edges expose the welder to a fall.
Control: Complete the hot-work review above, below and along concealed paths. Remove or protect combustibles, assign fire watch and prepare response equipment. Maintain edge/opening protection, access and screens; confirm known-coating, ventilation and assessed protection arrangements.
Verification: Hot-work lead and deck lead verify the upper and lower boundaries and each assigned protection role.
Why this belongs in the analysis: A clear upper deck does not prove that heat and sparks have a safe destination underneath.
3. Prepare equipment and weld fit-up
Hazard: Damaged leads, unsuitable return contact or a gap at the support can cause shock, arcing elsewhere or an unaccepted attachment.
Control: Welder checks equipment, insulated holder, cables and grounding under actual instructions. Route leads safely and establish the specified return path. Verify deck-to-support contact and attachment details, including washers only when specified; refer gaps or changed materials before welding.
Verification: Welder records equipment and fit-up findings, and the lead resolves unaccepted attachment conditions.
Why this belongs in the analysis: A visible puddle cannot compensate for an unreviewed gap or a different base-material combination.
4. Complete the specified arc-spot attachments
Hazard: Arc exposure, fume accumulation or incorrect weld formation can injure workers and leave inadequate deck attachment.
Control: Qualified welder follows the accepted welding procedure and attachment layout with screens, ventilation and fire controls operating. Maintain a protected stance and cable route; monitor actual attachment conditions. Stop for changed fit-up, burn-through, abnormal equipment response or an ineffective exposure control rather than improvising weld time or machine settings.
Verification: Welder checks completed locations against the layout and reports questionable welds to the assigned reviewer.
Why this belongs in the analysis: Weld formation requires the accepted deck/support procedure, not a universal current or elapsed time.
5. Review connections and resolve defects
Hazard: An incomplete attachment pattern or cosmetic repair can conceal a connection that has not met its acceptance criteria.
Control: Assigned reviewer performs required connection checks and records findings by location. Preserve area restrictions while discrepancies receive an accepted repair method. Qualified personnel complete authorized corrections under the applicable procedure and repeat required checks before handover.
Verification: Reviewer records completed, unaccepted and corrected locations and communicates any remaining hold to the deck lead.
Why this belongs in the analysis: Counting spots alone cannot establish the required attachment quality or authorize an improvised repair.
6. Close out welding and hand over restrictions
Hazard: Residual heat, an unattended electrode or assumed deck-load permission can create hazards after the welder leaves.
Control: Welder shuts down and secures equipment using its instructions and removes hot debris safely. Fire watch completes the site’s required continuing observations and closeout, including the underside. Record connection-review status and transfer remaining load and access limits to the receiving lead; concrete placement remains a separate release.
Verification: Hot-work lead records actual monitoring closeout and deck lead confirms unresolved connection and loading restrictions.
Why this belongs in the analysis: Finishing the last weld does not complete fire prevention or release the deck for another operation.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Use the settings from the last deck job. | Qualified welder follows the accepted procedure for this deck, support and attachment detail, with specified checks and defect disposition. |
| All the spots are visible; send the fire watch away. | Complete the required connection review and hot-work monitoring, record actual findings and preserve separate deck-loading restrictions. |
Common questions
Can this example be used as a JSA?
Adapt its Task | Hazard | Control analysis to the employer’s JSA format and actual work. Confirm assigned checks and record real findings before relying on the plan.
What changes if the project requires an AHA?
Use the project’s governing AHA format, risk method, supporting records and acceptance process. The published formwork AHA illustrates that additional structure; this JHA establishes no AHA risk rating or acceptance.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- Steel Deck Institute: arc puddle welds and weld washers
- OSHA 1926.351 Arc welding equipment and operating instructions
- OSHA 1926.352 Welding fire prevention
- OSHA 1926.353 Welding ventilation and protection
- OSHA 1926.760 Steel erection fall protection and controlled decking zones
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.