Stationary Masonry Saw Operation JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Stationary Masonry Saw Operation JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Release the station and unit cuts
Possible hazards: An unstable stand, overcrowded cut path or incompatible unit can expose workers to moving equipment and fragments.
Planned controls: Cutting lead selects released marked cuts suited to the actual stationary saw and blade. Establish a stable station and carrier travel zone away from deliveries, with room to stage manageable units and remove finished pieces. Reject oversize work that cannot be supported or controlled as the manual requires.
Check before work: Lead checks machine support, unit dimensions, marked cuts and clear operating space.
022. Inspect and set up with power isolated
Possible hazards: Damaged blades, open guards or unexpected starting can cause contact injury and blade failure.
Planned controls: Disconnect and secure the saw’s supply under its actual isolation instructions before setup. Inspect the compatible blade, mounting, enclosure, drive guarding, carrier, stand and controls. Complete only the permitted adjustments, remove keys and tools and quarantine defects before the machine is connected for pre-use checks.
Check before work: Operator records blade/guard/carrier findings and verifies the setup safe state.
033. Establish water, power and slurry control
Possible hazards: Lost water can release silica; wet connections or pooled slurry can create shock and slips.
Planned controls: Connect the actual integrated system and verify continuous water delivery to the blade using the manufacturer’s criteria. Arrange the required protected electrical supply and keep connections clear of water. Contain slurry and preserve dry secure footing; the silica competent person checks the selected Table 1 implementation before production cuts.
Check before work: Operator confirms blade water delivery and the lead checks power, footing and containment.
044. Cut units on the supported carrier
Possible hazards: Hands, loose clothing or unstable stock can enter the blade path; fragments and noise expose others.
Planned controls: Use the manual’s carrier and unit-positioning method with hands outside the cutting area, intact guards and suitable assessed protection. Feed at the permitted rate without forcing or twisting the unit. Keep bystanders outside the station and stop immediately for binding, abnormal response, shifting stock or lost water delivery.
Check before work: Operator watches water and unit control during travel; the lead maintains station separation.
055. Stop before removing faults or adjusting
Possible hazards: Reaching past a coasting blade or treating a switch as isolation can cause severe contact injury.
Planned controls: Use the actual stopping procedure and wait for complete blade motion to cease before the permitted unloading action. Disconnect and secure power before jam clearing, blade work or hazardous adjustments. Correct water or carrier faults in the required safe state and repeat relevant checks before restart.
Check before work: Operator verifies stopped motion and required isolation before entering hazardous parts.
066. Collect residue and secure the station
Possible hazards: Dried slurry can become airborne silica and abandoned cut pieces can create sharp-edge or trip exposure.
Planned controls: Clean the stopped, isolated equipment by its approved method. Collect slurry while wet and handle it under site waste arrangements; use suitable wet or HEPA methods for remaining residue. Do not dry sweep or blow this station clean. Secure blades, useful stock and the supply, and transfer defects or operating restrictions.
Check before work: Cutting lead checks residue collection, electrical/tool state and clear access before handover.
Example scope and starting conditions
A trained masonry worker will cut marked brick and CMU units using a guarded electric stationary masonry saw with its integrated continuous water system at a separated outdoor ground-level station. The actual machine’s carrier supports the units, and slurry is collected before it dries. This example follows setup, cutting, stopping and controlled cleanup. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The selected saw, manufacturer-approved diamond blade, carrier, stand and power supply are suitable for the identified units and planned straight cuts.
- The employer fully implements the stationary-masonry-saw Table 1 water method and actual maintenance instructions, with competent-person oversight and assessed other exposure controls.
- Masonry-saw coverage is bounded to this stationary wet method; 238140-11 is partial because handheld cutting, splitters, dry methods and cutting installed walls are excluded.
Know when to pause
- Blade, guard, carrier, stand or protected electrical arrangement is defective or unsuitable for the unit.
- Water delivery fails, stock moves, the blade binds or slurry defeats safe footing and containment.
- Work changes to dry cutting, a handheld saw, installed masonry or a unit the carrier cannot control.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Can each unit be supported on the carrier with hands outside the cutting zone throughout its travel?
- What verifies continuous integrated water delivery before and during every cut?
- How are electrical connections, slurry collection and stopped-motion/isolation checks kept effective together?
Training and qualifications to confirm
- Actual saw instruction covering carrier travel, guarding, blade compatibility, water setup, stopping and safe isolation for adjustments.
- Applicable silica-control method and housekeeping, wet electrical protection, assessed eye/hearing protection and defect reporting.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Can the walk-behind concrete-saw example substitute here?
No. That operator moves an engine-powered saw through a ground slab. This worker feeds discrete units on a stationary carrier with different hand locations, guarding, wet electrical and slurry arrangements. Both need controls matched to the actual tool and silica method.
What must the crew record for actual use?
Record the actual work boundary, equipment and materials, responsible people, applicable criteria, control checks and unresolved actions. Keep changed conditions on hold, communicate restrictions to affected crews and obtain the required project authorization before work.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Silica: Verify Dust Controls Before Cutting →Powered Tools: Check the Tool, Guard and Accessory →Electrical & Extension-Cord Checks →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Release the station and unit cuts
Hazard: An unstable stand, overcrowded cut path or incompatible unit can expose workers to moving equipment and fragments.
Control: Cutting lead selects released marked cuts suited to the actual stationary saw and blade. Establish a stable station and carrier travel zone away from deliveries, with room to stage manageable units and remove finished pieces. Reject oversize work that cannot be supported or controlled as the manual requires.
Verification: Lead checks machine support, unit dimensions, marked cuts and clear operating space.
Why this belongs in the analysis: A masonry unit is not safe to cut merely because it can touch the blade.
2. Inspect and set up with power isolated
Hazard: Damaged blades, open guards or unexpected starting can cause contact injury and blade failure.
Control: Disconnect and secure the saw’s supply under its actual isolation instructions before setup. Inspect the compatible blade, mounting, enclosure, drive guarding, carrier, stand and controls. Complete only the permitted adjustments, remove keys and tools and quarantine defects before the machine is connected for pre-use checks.
Verification: Operator records blade/guard/carrier findings and verifies the setup safe state.
Why this belongs in the analysis: Guard condition and unit support must be checked separately from the water system.
3. Establish water, power and slurry control
Hazard: Lost water can release silica; wet connections or pooled slurry can create shock and slips.
Control: Connect the actual integrated system and verify continuous water delivery to the blade using the manufacturer’s criteria. Arrange the required protected electrical supply and keep connections clear of water. Contain slurry and preserve dry secure footing; the silica competent person checks the selected Table 1 implementation before production cuts.
Verification: Operator confirms blade water delivery and the lead checks power, footing and containment.
Why this belongs in the analysis: Water must reach the cutting surface rather than only wetting the surrounding station.
4. Cut units on the supported carrier
Hazard: Hands, loose clothing or unstable stock can enter the blade path; fragments and noise expose others.
Control: Use the manual’s carrier and unit-positioning method with hands outside the cutting area, intact guards and suitable assessed protection. Feed at the permitted rate without forcing or twisting the unit. Keep bystanders outside the station and stop immediately for binding, abnormal response, shifting stock or lost water delivery.
Verification: Operator watches water and unit control during travel; the lead maintains station separation.
Why this belongs in the analysis: A clear pre-use check does not guarantee the controls remain effective during the cut.
5. Stop before removing faults or adjusting
Hazard: Reaching past a coasting blade or treating a switch as isolation can cause severe contact injury.
Control: Use the actual stopping procedure and wait for complete blade motion to cease before the permitted unloading action. Disconnect and secure power before jam clearing, blade work or hazardous adjustments. Correct water or carrier faults in the required safe state and repeat relevant checks before restart.
Verification: Operator verifies stopped motion and required isolation before entering hazardous parts.
Why this belongs in the analysis: Normal unloading and fault intervention need different access and energy checks.
6. Collect residue and secure the station
Hazard: Dried slurry can become airborne silica and abandoned cut pieces can create sharp-edge or trip exposure.
Control: Clean the stopped, isolated equipment by its approved method. Collect slurry while wet and handle it under site waste arrangements; use suitable wet or HEPA methods for remaining residue. Do not dry sweep or blow this station clean. Secure blades, useful stock and the supply, and transfer defects or operating restrictions.
Verification: Cutting lead checks residue collection, electrical/tool state and clear access before handover.
Why this belongs in the analysis: The dust-control method must extend beyond the last powered cut.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Spray the blocks occasionally to reduce dust. | Use the actual integrated system that continuously feeds water to the blade, verify flow during cutting and stop when delivery fails. |
| Switch off and reach in to clear the carrier. | Wait for blade motion to stop and secure the disconnected supply before hazardous adjustment or jam clearing, then recheck the corrected setup. |
Common questions
Can this example be used as a JSA?
Adapt the Task | Hazard | Control sequence to the employer’s JSA format and actual worksite. Name the people who will check controls and record their findings; this learning example supplies no completed field inspection.
What changes if the project requires an AHA?
Use the governing AHA format, risk method, supporting records and acceptance process. The published formwork AHA illustrates that additional structure. Add the actual competencies, inspections and project reviews rather than assuming a renamed JHA meets those requirements.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- MK Diamond MK-2000 electric masonry saw owner’s manual
- OSHA 1926.1153 Silica Table 1 and housekeeping
- OSHA 1926.300 Hand and power tools
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026