Structural Steel Magnetic Drilling JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Structural Steel Magnetic Drilling JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Release the structural alteration
Possible hazards: A wrongly placed hole or changed load path can weaken the member or disturb the supported structure.
Planned controls: Retrofit lead compares the marked holes with the current engineer-released alteration and sequence. Confirm required support/load restrictions and coating condition; hold unmarked changes, unknown coatings or unresolved structural findings.
Check before work: Lead and operator check member identity and the approved marks before tool placement.
022. Control access and the exit side
Possible hazards: An ejected slug or hot sharp chips can strike another worker or enter adjacent work.
Planned controls: Establish protected operator access and close the chip/slug path and opposite face to others. Select a compatible capture or exclusion arrangement without obstructing the cutter; coordinate other work and keep required platform protection intact.
Check before work: Area lead checks both faces and the potential falling-object path before setup.
033. Inspect the drill and verify adhesion suitability
Possible hazards: An unsuitable magnetic surface or damaged retention can let the tool shift or fall.
Planned controls: Operator inspects the drill, guards, cutter, leads and required safety chain/strap. Compare actual material, contact area, thickness and surface condition with this model’s criteria; use only an approved clamping/retention solution and stop if suitability is uncertain.
Check before work: Operator checks the model instructions, contact surface and secondary retention before motor use.
044. Set the tool in the permitted configuration
Possible hazards: Unplanned cutter or lubricant selection can cause tool failure; unsafe setup can expose hands to rotation.
Planned controls: With the tool in its prescribed safe adjustment state, fit the approved cutter and arrange permitted lubricant/cooling for the operating orientation. Secure the tool and retention under instructions; route power and supplies away from access and rotating parts.
Check before work: Operator verifies the setup and clears hands, loose clothing and accessories before starting.
055. Drill while monitoring stability
Possible hazards: Magnet lift, cutter binding or reaching into rotating swarf can cause entanglement and broken-tool injuries.
Planned controls: Follow the selected model’s operating method from the protected position. Keep hands and loose items clear of rotation and never clear chips while running; stop for lift, movement, abnormal cutting or lost power and reassess before restart.
Check before work: Operator monitors tool contact and cutter response; attendant maintains the chip/slug boundary.
066. Stop, collect residue and record the hole
Possible hazards: Residual rotation, hot chips or a loose slug can injure a worker during removal; an incorrect hole can be hidden by the next connection.
Planned controls: Stop and isolate as required before clearing, changing or removing the tool, verifying rotation has ceased. Collect chips/slug with suitable tools and protection, document actual hole findings and refer discrepancies before connection installation.
Check before work: Operator checks the cleared area; retrofit lead records hole acceptance actions and retained load restrictions.
Example scope and starting conditions
A retrofit crew will cold-drill engineer-released connection holes in an existing stabilized building steel member from a protected stationary work platform. The selected magnetic-base drill, annular cutter and secondary retention must be suitable for the actual surface and operating orientation. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The structural alteration release identifies the permitted hole locations, dimensions, sequence and any load/support restrictions.
- The actual steel thickness, surface condition, coatings and drill orientation must satisfy the selected equipment instructions; coating disturbance is released separately.
- This is partial coverage of steel modification/retrofit. Anchor-rod alteration, hot cutting, active welding on the member, unknown coatings and unapproved structural changes are excluded.
Know when to pause
- Hole marks, member condition, coating identification or structural restrictions differ from the release.
- Magnet/retention suitability is uncertain or the tool lifts, shifts, binds or loses power.
- The protected platform, chip/slug boundary or stopped adjustment condition is lost.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Who releases the hole layout and maintains any structural load/support restrictions during drilling?
- Does this member surface and thickness meet the drill’s adhesion and secondary-retention criteria?
- How will people be excluded from chips, the ejected slug and the opposite side of the hole?
Training and qualifications to confirm
- Selected magnetic drill/cutter instruction, secondary retention, stopped adjustment and response to loss of adhesion or power.
- Crew instruction in structural alteration limits, protected access, chip/slug boundaries and coating/exposure findings.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Can the magnetic drill work while another crew welds on the same member?
That work is excluded here. Coordinate electrical and equipment interfaces and follow the actual drill instructions; do not assume magnetic adhesion and electronics remain suitable while welding occurs on the workpiece.
What must the crew record for actual use?
Record the engineer-released member/hole schedule, structural and coating restrictions, drill/cutter identity, actual adhesion/retention basis, operating orientation, both-side boundaries, observations and hole discrepancies. Do not invent feed speeds, thickness thresholds or structural acceptance.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Powered Tools: Check the Tool, Guard and Accessory →Electrical & Extension-Cord Checks →Eye & Face Protection →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Release the structural alteration
Hazard: A wrongly placed hole or changed load path can weaken the member or disturb the supported structure.
Control: Retrofit lead compares the marked holes with the current engineer-released alteration and sequence. Confirm required support/load restrictions and coating condition; hold unmarked changes, unknown coatings or unresolved structural findings.
Verification: Lead and operator check member identity and the approved marks before tool placement.
Why this belongs in the analysis: Permission to install a connection is not permission to drill anywhere convenient.
2. Control access and the exit side
Hazard: An ejected slug or hot sharp chips can strike another worker or enter adjacent work.
Control: Establish protected operator access and close the chip/slug path and opposite face to others. Select a compatible capture or exclusion arrangement without obstructing the cutter; coordinate other work and keep required platform protection intact.
Verification: Area lead checks both faces and the potential falling-object path before setup.
Why this belongs in the analysis: The person exposed by the hole may be on the other side of the steel.
3. Inspect the drill and verify adhesion suitability
Hazard: An unsuitable magnetic surface or damaged retention can let the tool shift or fall.
Control: Operator inspects the drill, guards, cutter, leads and required safety chain/strap. Compare actual material, contact area, thickness and surface condition with this model’s criteria; use only an approved clamping/retention solution and stop if suitability is uncertain.
Verification: Operator checks the model instructions, contact surface and secondary retention before motor use.
Why this belongs in the analysis: A magnet switching on does not prove adequate holding for the cut.
4. Set the tool in the permitted configuration
Hazard: Unplanned cutter or lubricant selection can cause tool failure; unsafe setup can expose hands to rotation.
Control: With the tool in its prescribed safe adjustment state, fit the approved cutter and arrange permitted lubricant/cooling for the operating orientation. Secure the tool and retention under instructions; route power and supplies away from access and rotating parts.
Verification: Operator verifies the setup and clears hands, loose clothing and accessories before starting.
Why this belongs in the analysis: Settings and accessories depend on the actual tool, cutter and workpiece.
5. Drill while monitoring stability
Hazard: Magnet lift, cutter binding or reaching into rotating swarf can cause entanglement and broken-tool injuries.
Control: Follow the selected model’s operating method from the protected position. Keep hands and loose items clear of rotation and never clear chips while running; stop for lift, movement, abnormal cutting or lost power and reassess before restart.
Verification: Operator monitors tool contact and cutter response; attendant maintains the chip/slug boundary.
Why this belongs in the analysis: An automatic safety feature supplements active observation and secondary retention.
6. Stop, collect residue and record the hole
Hazard: Residual rotation, hot chips or a loose slug can injure a worker during removal; an incorrect hole can be hidden by the next connection.
Control: Stop and isolate as required before clearing, changing or removing the tool, verifying rotation has ceased. Collect chips/slug with suitable tools and protection, document actual hole findings and refer discrepancies before connection installation.
Verification: Operator checks the cleared area; retrofit lead records hole acceptance actions and retained load restrictions.
Why this belongs in the analysis: Safe tool removal and structural acceptance are separate closeout tasks.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| The magnet is on, so drill. | Operator verifies actual thickness, surface, full contact and model-specific retention criteria before motor use and monitors contact throughout the cut. |
| Brush off the chips while cutting. | Operator stops and establishes the prescribed safe adjustment condition before using suitable tools to collect chips; hands remain clear of rotating parts. |
Common questions
Can this example be used as a JSA?
Adapt its Task | Hazard | Control analysis to the employer’s format and actual conditions. The example is a teaching aid, not evidence that controls were checked.
What changes if the project requires an AHA?
Use the governing AHA format, risk method, supporting records and acceptance process. The published formwork AHA demonstrates that additional structure; changing a JHA title does not supply it.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- Hougen Magnetic drill operator instructions
- Hougen Magnetic adhesion and secondary retention
- OSHA 1926.300 Tool condition and guarding
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 9, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.