Unitized Curtain Wall Installation JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Unitized Curtain Wall Installation JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Release the facade bay
Possible hazards: Unready anchors or an unstable receiving structure can permit module collapse.
Planned controls: Facade lead verifies frame/bay release, anchors and the approved setting sequence. Identify interfaces with edge protection and floors below; keep work on hold for incomplete supports.
Check before work: Lead compares the bay and module marks with current facade documents.
022. Protect receiving positions
Possible hazards: An open facade or crane load can expose installers to falls and crushing.
Planned controls: Establish the planned protected positions, fall system and rescue arrangements before any edge protection changes. Separate lower levels and keep installers out of the approaching module’s path.
Check before work: Erection/facade lead checks receiving access and protection before pickup.
033. Rig the complete module
Possible hazards: Glass, frame or lifting attachments can fail if used outside their design.
Planned controls: Qualified rigging personnel verify module condition, weight and the proprietary lifting arrangement. Lift through the specified points; do not assume a vacuum device rated for a loose pane can lift the entire framed module.
Check before work: Rigger matches attachments and module identification with the lift instructions.
044. Bring the module into position
Possible hazards: Wind can rotate a large module into workers or the building.
Planned controls: Use the agreed crane signals and planned orientation controls within the specified wind limits. Keep people clear of the suspended assembly and receive it from protected positions without reaching through crush gaps.
Check before work: Signal person and receiving lead monitor control and clearance throughout approach.
055. Engage and verify anchors
Possible hazards: A partially engaged bracket can release after the crane disconnects.
Planned controls: Complete the documented bearing, anchor engagement and restraint checks while crane support remains. Verify the required hold points and obtain designated release before unrigging; do not rely on appearance or one engaged corner.
Check before work: Facade lead records actual anchor checks against the approved setting criteria.
066. Secure and hand over the bay
Possible hazards: Unfinished joints or missing edge protection can expose later crews.
Planned controls: Maintain required protection, identify unfinished joints and restrict loading/access under the facade stage release. Transfer module and anchor status to the weatherseal and inspection teams.
Check before work: Receiving lead confirms protection and open actions at handover.
Example scope and starting conditions
A specialist facade crew will crane-set a factory-glazed unitized curtain-wall module at a released upper-floor position on a stabilized steel-frame building. Installers receive the module from protected floor-side positions. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- Module weight, proprietary lifting points, anchors and connection sequence are defined in approved facade/erection documents.
- The employer establishes applicable steel-erection and fall provisions, protected receiving access and rescue arrangements for this operation.
- Loose-pane glazing, field structural-silicone bonding, suspended-platform erection and using the module as fall protection are excluded.
Know when to pause
- Module damage, lifting uncertainty or lost wind control.
- Unready anchor, unexpected fit or incomplete engagement.
- Receiving protection, crane communication or lower-level exclusion fails.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Which document verifies the complete glazed module’s lifting attachment?
- How are installers protected while the module enters the facade opening?
- What confirms anchor engagement and stability before crane release?
Training and qualifications to confirm
- Module-specific erection, anchor engagement and crane-release instruction with applicable lift qualifications.
- Applicable steel-erection/fall training and facade receiving/rescue responsibilities.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Can a pane-rated vacuum lifter handle a complete curtain-wall module?
Only if the actual device and complete-module arrangement are specifically approved for that load and surface. This example uses the module’s defined lifting points; it does not extend the ground-level loose-pane lifting example.
What must the crew record for actual use?
Identify the actual equipment and work boundaries, responsible people, applicable criteria, inspection findings and open actions. Resolve changes with affected crews and obtain required project authorization before work.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Rigging: Before the Load Moves →Fall Prevention: Verify the Controls →Severe Weather: Know When and Where to Shelter →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Release the facade bay
Hazard: Unready anchors or an unstable receiving structure can permit module collapse.
Control: Facade lead verifies frame/bay release, anchors and the approved setting sequence. Identify interfaces with edge protection and floors below; keep work on hold for incomplete supports.
Verification: Lead compares the bay and module marks with current facade documents.
Why this belongs in the analysis: A factory-glazed unit still depends on site anchor readiness.
2. Protect receiving positions
Hazard: An open facade or crane load can expose installers to falls and crushing.
Control: Establish the planned protected positions, fall system and rescue arrangements before any edge protection changes. Separate lower levels and keep installers out of the approaching module’s path.
Verification: Erection/facade lead checks receiving access and protection before pickup.
Why this belongs in the analysis: The module’s arrival changes the facade opening but does not remove fall exposure.
3. Rig the complete module
Hazard: Glass, frame or lifting attachments can fail if used outside their design.
Control: Qualified rigging personnel verify module condition, weight and the proprietary lifting arrangement. Lift through the specified points; do not assume a vacuum device rated for a loose pane can lift the entire framed module.
Verification: Rigger matches attachments and module identification with the lift instructions.
Why this belongs in the analysis: The framed assembly has a different load path from its glass pane.
4. Bring the module into position
Hazard: Wind can rotate a large module into workers or the building.
Control: Use the agreed crane signals and planned orientation controls within the specified wind limits. Keep people clear of the suspended assembly and receive it from protected positions without reaching through crush gaps.
Verification: Signal person and receiving lead monitor control and clearance throughout approach.
Why this belongs in the analysis: Large glazed modules present substantial wind area.
5. Engage and verify anchors
Hazard: A partially engaged bracket can release after the crane disconnects.
Control: Complete the documented bearing, anchor engagement and restraint checks while crane support remains. Verify the required hold points and obtain designated release before unrigging; do not rely on appearance or one engaged corner.
Verification: Facade lead records actual anchor checks against the approved setting criteria.
Why this belongs in the analysis: Connection completion must be confirmed before support transfer.
6. Secure and hand over the bay
Hazard: Unfinished joints or missing edge protection can expose later crews.
Control: Maintain required protection, identify unfinished joints and restrict loading/access under the facade stage release. Transfer module and anchor status to the weatherseal and inspection teams.
Verification: Receiving lead confirms protection and open actions at handover.
Why this belongs in the analysis: Module setting does not settle weatherseal or final facade acceptance.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Work carefully and wear PPE. | Qualified rigging personnel verify module condition, weight and the proprietary lifting arrangement. Lift through the specified points; do not assume a vacuum device rated for a loose pane can lift the entire framed module. |
| Check that everything is ready. | Facade lead verifies frame/bay release, anchors and the approved setting sequence. Identify interfaces with edge protection and floors below; keep work on hold for incomplete supports. |
Common questions
Can this example be used as a JSA?
Adapt its Task | Hazard | Control analysis to the employer’s format and actual conditions. The example is a teaching aid, not evidence that controls were checked.
What changes if the project requires an AHA?
Use the governing AHA format, risk method, supporting records and acceptance process. The published formwork AHA demonstrates that additional structure; changing a JHA title does not supply it.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- OSHA 1926.761 Steel erection training
- OSHA 1926.760 Steel erection fall protection
- OSHA 1926.21 Safety training and education
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 9, 2026