Dry Mix Shotcrete Wall JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Dry Mix Shotcrete Wall JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Define the dry-process work and crew roles
Possible hazards: Using a wet-pump procedure for a dry gun or an unqualified nozzle role can leave the mixture formation and delivery hazards unmanaged.
Planned controls: Specialist lead identifies the substrate area, accepted dry-process method, material and selected equipment. Assign the gun operator, qualified nozzle operator and support roles with a common stop command. Confirm required application acceptance and any testing responsibilities before starting; resolve changes with the responsible technical authority.
Check before work: Lead verifies the selected system, released method and assigned qualifications.
022. Establish separate feed and nozzle protection
Possible hazards: Material handling dust, airborne rebound and an exposed hose path can injure workers outside the apparent target area.
Planned controls: Crew arranges controlled bag handling or the approved feed method, the employer’s specified dust controls and a restricted application zone. Provide stable nozzle footing and a protected hose route without sharp damage points or public crossings. Locate support workers outside rebound and hose movement paths; arrange cleanup collection before loose material accumulates.
Check before work: Lead checks both exposure locations, controls, routes and boundaries.
033. Check the selected gun and supplies
Possible hazards: Damaged connections, missing guarding or unsuitable air and water supplies can cause unexpected hose movement, exposure or uncontrolled dry material delivery.
Planned controls: Trained operators complete the actual system’s pre-use checks for guards, hose condition, couplings, nozzle assembly and required supply readiness. Secure connections as specified and confirm stop communication before introducing material. Keep personnel clear during the prescribed startup and functional checks; quarantine defects instead of adjusting around them.
Check before work: Operators confirm assigned pre-use checks and the startup hold point.
044. Feed and apply through coordinated operator control
Possible hazards: Interrupted water, erratic feed or uncontrolled nozzle movement can discharge poorly controlled material, create rebound or strike someone in the application zone.
Planned controls: Gun operator feeds the approved material through the actual equipment method while the qualified nozzle operator controls water addition and wall application under the accepted procedure. Maintain stable positions and the restricted zone. Either operator stops for lost communication, abnormal delivery or a supply problem; do not compensate with improvised pressure or water settings.
Check before work: Assigned observer reports specified delivery and application deviations to operators.
055. Control interruptions and collected rebound
Possible hazards: Reaching into the gun, opening a suspect line or reusing unaccepted rebound can cause machinery injury, released energy or hidden material defects.
Planned controls: Use the selected system’s controlled stop procedure before addressing an interruption. Keep affected equipment and areas held while the responsible trained personnel identify the problem. Blockage clearing or guard-access servicing follows a separate authorized, energy-controlled method. Collect rebound through the planned protected process; route it as specified rather than assuming it can return to the mix.
Check before work: Lead verifies the interruption decision and actual restart requirements.
066. Shut down and hand over the wall
Possible hazards: Residual energy, loose rebound or assumed wall acceptance can expose the cleanup crew and obscure unfinished application checks.
Planned controls: Operators follow the actual shutdown and routine cleaning instructions with the applicable energy controls and exclusion maintained. Remove collected material using the specified dust-controlled method and retain waste containment. Record application areas and deviations for the responsible acceptance personnel, then transfer separate curing, surface review and any repair decisions to identified leads.
Check before work: Lead checks shutdown, cleanup and unresolved wall actions with receivers.
Example scope and starting conditions
A specialist crew will apply dry-process shotcrete to an accessible outdoor building wall from protected ground positions. Dry or damp material enters the gun; compressed air conveys it and the qualified nozzle operator adds water. The actual system method governs the separate feed and nozzle operations. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The wall, substrate and dry-process method are released. Qualified personnel use the identified gun, hose, nozzle, material and required supplies; this example gives no generic pressure or water recipe.
- The employer evaluates actual feed and nozzle dust and rebound exposure and specifies engineering, access and respiratory controls. No universally greater dry-process exposure is assumed.
- The shotcrete link 238110-19 is partial: ground-level dry-process wall application only. Wet-mix pumping, overhead or underground work, confined spaces, structural repair diagnosis, hose blockage clearing and machine repair require separate analyses.
Know when to pause
- Material, substrate release, assigned dry-process qualifications or applicable equipment instructions do not match the planned work.
- Communication, air or water supply, hose behavior or material delivery becomes abnormal.
- Feed-point dust controls, rebound exclusion, footing, respiratory arrangements or safe shutdown access are lost.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Which actual gun, nozzle and material instructions govern this dry-process application and its stop sequence?
- How are feed-point and nozzle exposures evaluated and controlled, and who keeps other workers out?
- What communication and supply conditions permit the nozzle operator to start, stop or reject application?
Training and qualifications to confirm
- Selected dry-process system instruction for the gun operator and qualified nozzle operator, including material feeding, coordinated stop commands and recognition of abnormal delivery.
- Instruction on the employer’s actual silica and rebound controls, respiratory-program requirements where applicable, protected work positions and safe collected-material handling.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Can a helper adjust water at the nozzle when the assigned nozzle operator leaves?
Stop through the agreed system procedure and secure the affected work. Nozzle water addition is part of the qualified dry-process application role, not an incidental hose adjustment. Resume only when an appropriately qualified assigned operator, supply readiness and the accepted method are restored. This example supplies no substitute pressure or water ratio.
What must the crew record for actual use?
Record wall and method identity, material and equipment instructions, assigned qualifications, exposure controls, actual pre-use findings, interruptions and completed areas. Identify unresolved acceptance or curing actions, actual shutdown condition and receiving lead; do not copy the fictional plan as a favorable inspection.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Silica: Verify Dust Controls Before Cutting →Concrete Pumps and Hoses: Verify Before Flow →Energy Isolation: Verify Before Servicing →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Define the dry-process work and crew roles
Hazard: Using a wet-pump procedure for a dry gun or an unqualified nozzle role can leave the mixture formation and delivery hazards unmanaged.
Control: Specialist lead identifies the substrate area, accepted dry-process method, material and selected equipment. Assign the gun operator, qualified nozzle operator and support roles with a common stop command. Confirm required application acceptance and any testing responsibilities before starting; resolve changes with the responsible technical authority.
Verification: Lead verifies the selected system, released method and assigned qualifications.
Why this belongs in the analysis: The identified process determines equipment and operator responsibilities.
2. Establish separate feed and nozzle protection
Hazard: Material handling dust, airborne rebound and an exposed hose path can injure workers outside the apparent target area.
Control: Crew arranges controlled bag handling or the approved feed method, the employer’s specified dust controls and a restricted application zone. Provide stable nozzle footing and a protected hose route without sharp damage points or public crossings. Locate support workers outside rebound and hose movement paths; arrange cleanup collection before loose material accumulates.
Verification: Lead checks both exposure locations, controls, routes and boundaries.
Why this belongs in the analysis: The feed location and nozzle require separate exposure controls.
3. Check the selected gun and supplies
Hazard: Damaged connections, missing guarding or unsuitable air and water supplies can cause unexpected hose movement, exposure or uncontrolled dry material delivery.
Control: Trained operators complete the actual system’s pre-use checks for guards, hose condition, couplings, nozzle assembly and required supply readiness. Secure connections as specified and confirm stop communication before introducing material. Keep personnel clear during the prescribed startup and functional checks; quarantine defects instead of adjusting around them.
Verification: Operators confirm assigned pre-use checks and the startup hold point.
Why this belongs in the analysis: Connected equipment is not evidence of coordinated operating readiness.
4. Feed and apply through coordinated operator control
Hazard: Interrupted water, erratic feed or uncontrolled nozzle movement can discharge poorly controlled material, create rebound or strike someone in the application zone.
Control: Gun operator feeds the approved material through the actual equipment method while the qualified nozzle operator controls water addition and wall application under the accepted procedure. Maintain stable positions and the restricted zone. Either operator stops for lost communication, abnormal delivery or a supply problem; do not compensate with improvised pressure or water settings.
Verification: Assigned observer reports specified delivery and application deviations to operators.
Why this belongs in the analysis: Nozzle mixture formation depends on coordinated feed and water control.
5. Control interruptions and collected rebound
Hazard: Reaching into the gun, opening a suspect line or reusing unaccepted rebound can cause machinery injury, released energy or hidden material defects.
Control: Use the selected system’s controlled stop procedure before addressing an interruption. Keep affected equipment and areas held while the responsible trained personnel identify the problem. Blockage clearing or guard-access servicing follows a separate authorized, energy-controlled method. Collect rebound through the planned protected process; route it as specified rather than assuming it can return to the mix.
Verification: Lead verifies the interruption decision and actual restart requirements.
Why this belongs in the analysis: A stoppage does not authorize access to hazardous energy.
6. Shut down and hand over the wall
Hazard: Residual energy, loose rebound or assumed wall acceptance can expose the cleanup crew and obscure unfinished application checks.
Control: Operators follow the actual shutdown and routine cleaning instructions with the applicable energy controls and exclusion maintained. Remove collected material using the specified dust-controlled method and retain waste containment. Record application areas and deviations for the responsible acceptance personnel, then transfer separate curing, surface review and any repair decisions to identified leads.
Verification: Lead checks shutdown, cleanup and unresolved wall actions with receivers.
Why this belongs in the analysis: A clear record prevents hidden interruption or acceptance concerns.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Shotcrete is shotcrete; use the wet-mix pump checklist. | Identify the dry gun, feed operation and nozzle water addition, then verify the actual system’s distinct readiness and operator roles. |
| Only the nozzle crew needs a dust plan. | Evaluate and control the feed location, nozzle zone, hose route and collected-material cleanup through the actual exposure assessment. |
Common questions
Can this example be used as a JSA?
Adapt the Task | Hazard | Control analysis to the employer’s JSA and actual work. Confirm assigned checks and record real findings before use.
What changes if the project requires an AHA?
Use the project’s governing AHA format, risk method and acceptance process. The published formwork AHA illustrates additional structure; this example supplies no AHA risk rating or acceptance.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- American Shotcrete Association Dry-Mix process
- OSHA 1926.1153 Respirable crystalline silica
- OSHA 1926.702 Concrete construction equipment
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.