Stopped equipment can still move or release energy. Before clearing a jam or servicing a machine, confirm how the actual energy hazards will be controlled and who is authorized to verify protection.

Download the free toolbox talk

The one-page talk, editable Word version, and guidance below are open to everyone. No account required.

Preview the one-page toolbox talkActual first page of Energy Isolation: Verify Before Servicing; use the PDF download for readable full text

Supporting documents

Supervisor field checks and attendance records are included with a free account. No payment is required.

Supervisor field check

A separate check to verify conditions and controls before work. Includes a one-page PDF and editable Word file.

Attendance sheet

A separate sign-in sheet to record the toolbox talk. Includes a one-page PDF and editable Word file.

Need the crew records? Create a free account to use these supporting documents and Jenkins Academy of Applied Technology. No payment is required. Email updates are optional.

Create Free Account

Already have an account? Sign in

A 5–10 minute toolbox talk, plus the time needed for field verification. All six downloads are free without a required signup.

Why this matters

Stopped equipment can still move or release energy. Before clearing a jam or servicing a machine, confirm how the actual energy hazards will be controlled and who is authorized to verify protection.

Learning objective: Identify the applicable isolation procedure and evidence needed before exposure.

Key hazards or failure points

Unexpected restart; pressure, gravity or springs; another supply; wrong equipment; stored energy returning; protection lost during handoff.

Practical controls

  • Use the equipment-specific procedure for this task. Authorized personnel identify energy sources, isolation points and stored-energy controls. Resolve a mismatch before work.
  • Follow the required shutdown, isolation and lockout/tagout arrangement. A stop button is not an energy-isolating device. Do not substitute a tag for a lock for convenience.
  • Coordinate affected workers, contractors and shifts. Keep clear until authorized verification is complete. Never bypass another person’s protection.

Verify It in the Field

Match equipment identification and work boundaries to the procedure. Ask the authorized person which sources and stored-energy hazards it covers.

The authorized person performs the prescribed safe verification and records the actual result. Address energy that can reaccumulate. A visible lock or silent motor alone proves too little.

Confirm how each protected worker and incoming shift is covered. Record procedure revision, verifier, result and continuing checks. Electrical testing belongs to qualified personnel under the applicable electrical procedure.

Use the separate field check to record the acceptance source and criterion, safe method, checker, actual result and time. Mark VERIFIED, HOLD/NOT VERIFIED, or N/A with a reason. A checkmark alone is not evidence that protection works. Complete all required task checks; do not enter danger or improvise a test.

Examples of evidence to collect before exposure
ControlSafe verificationEvidence
Correct boundaryCompare actual equipment and task with the procedure.Equipment ID, procedure revision and resolved mismatch.
Effective isolationAuthorized person uses the prescribed safe method.Actual result, verifier and continuing-check requirement.
Protected handoffReview the actual group and shift-transfer arrangement.Protected work group, coordinator and resolved gaps.

Stop and reassess

Hold servicing for unknown energy, a failed check, movement, changed scope or an uncertain handoff. Keep clear, notify the authorized person, restore and verify protection, and rebrief before resuming.

toolbox talk questions

  • Which procedure covers this equipment and task?
  • Who verifies protection, and what result is required?
  • How will a shift change preserve protection?

A situation to discuss

Illustrative situation: a jammed machine is stopped at its control panel, but the repair extends beyond the equipment named in the isolation procedure. The crew holds the task while the authorized person resolves the boundary. Work starts only after the correct procedure and verification are completed.

Leader preparation and practical detail

Use the standard for the industry

OSHA 1910.147 covers specified general-industry servicing and expressly excludes construction employment. Construction requires its applicable activity-specific rules and employer procedures. This briefing does not choose an exception, design an isolation sequence or authorize energized work. [1]

Match evidence to the energy

The check must address the actual energy hazard. A failed start attempt may leave pressure, gravity or an independent electrical supply unresolved. Use the equipment procedure’s prescribed verification and continuing controls. Exposed electrical parts require the separately applicable electrical work practices; under 1910.333, deenergization testing is qualified-person work. [1, 2]

Plan continuity and restart

Agree on the group, contractor and shift arrangements before work. Return to service is a separate controlled process involving people, equipment, devices and notification. Finishing the repair is not automatic permission to remove protection or restart. [1]

Short supervisor field check

  • Equipment and task match the applicable procedure.
  • Authorized roles and electrical qualifications confirmed.
  • Energy sources and stored-energy controls addressed.
  • Required verification has acceptable actual results.
  • Group, contractor and shift handoffs preserve protection.

Record unresolved items, restrictions, correction owner, recheck result and required restart authorization. Reference permits and specialist inspections rather than treating this form as a replacement. Rebrief workers affected by a change.

Attendance and follow-through

Use the separate attendance sheet for participants, discussion concerns, actions and late-arrival rebriefs. Attendance does not establish competence, verify controls or authorize work. Keep completed records private under the employer’s recordkeeping procedures.

Technical scope and references

General-industry hazardous-energy preparation. OSHA 1910.147 does not cover construction employment; determine the applicable standard and procedure for the actual work. Electrical verification has separate qualification and work-practice requirements. [1, 2]

References reviewed October 7, 2026. Apply the industry, activity and jurisdiction that govern the work. No actual site permit, equipment manual, exposure assessment or engineering determination was supplied for this general discussion.

  1. OSHA 1910.147 — Control of hazardous energy — Scope, procedures, stored energy, verification and personnel changes.
  2. OSHA 1910.333 — Electrical work practices — General-industry deenergization and qualified-person verification.

Connect this discussion to your JHA/JSA

Use How to Conduct a Job Safety Analysis to connect task steps, hazards and controls. Revisit Pre-Job JHA/JSA: What Changed Today? when conditions change.

Related Todd Jerome Jenkins video: What Is Lockout Tagout?.

Related toolbox talks

Put one check into practice

Use the free JHA/JSA planning and field-verification worksheet to record today’s changes, important controls and the evidence needed before exposure.

Continue with a task-specific briefing

Apply this to a specific situation

Energy Isolation: Preserve Protection at Shift Change adds a focused toolbox exercise and field-verification guidance.

Apply this to a specific situation

Hydraulic Leaks: Never Search with Your Hands adds a focused toolbox exercise and field-verification guidance.

Apply this to a specific situation

Raised Equipment: What Holds It Up? adds a focused toolbox exercise and field-verification guidance.