A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Threaded Starter Bar Continuation JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Identify the accepted embedded starter system
Possible hazards: An incorrect coupler or bar designation can create a connection that appears assembled but lacks the approved splice function.
Planned controls: Reinforcement lead matches the construction joint, cast-in coupler locations and actual acceptance records to the current structural detail. Identify the selected compatible continuation bars and obtain the manufacturer’s installation and verification requirements. Hold missing identities or disputed embedded conditions for the responsible technical authority; do not infer compatibility from a thread that begins to turn.
Check before work: Lead verifies accepted coupler identity and the actual joint detail.
022. Prepare protected access and bar support
Possible hazards: An unsupported long bar, restricted rotation path or exposed starter can strike, trap or impale workers at the joint.
Planned controls: Crew establishes stable protected access, supported staging and the actual bar handling and rotation envelope. Keep nearby people and equipment clear and maintain suitable impalement protection on exposed reinforcement as required. Confirm the selected installation method fits the available clearance; resolve conflicts before positioning a bar rather than bending it or removing protection without a controlled replacement.
Check before work: Lead checks bar support, access, rotation clearance and impalement protection.
033. Prepare the permitted thread interface
Possible hazards: Damaged threads, debris or an improvised cleaning tool can prevent proper engagement and injure hands or damage the accepted coupler.
Planned controls: Crew removes the designated protective closure through the system’s permitted method and checks the exposed interface and continuation-bar end. Use only the specified preparation and cleaning process and retain protection on unattended couplers. Hold corrosion, cross-thread evidence or damaged components for responsible disposition; do not recut threads, force a tap through the embedded part or apply unapproved lubricant.
Check before work: Installer checks component match and permitted interface condition before engagement.
044. Engage the matched continuation bar
Possible hazards: Misalignment, uncontrolled rotation or forced threading can damage the connection and put workers in bar swing and pinch zones.
Planned controls: Installer supports and aligns the correct bar and begins engagement using the actual starter-system procedure. Keep the rotation path clear and advance through the required engagement without forcing a reluctant fit. Stop for unexpected resistance, inadequate clearance or an interface that does not meet the specified condition; obtain technical direction rather than using a longer lever or modifying the bar.
Check before work: Installer verifies specified engagement and reports any abnormal fit.
055. Complete and verify the specified connection
Possible hazards: A partially engaged or incorrectly fastened splice can be mistaken for a completed structural connection, while unsuitable tools add force and handling hazards.
Planned controls: Qualified assigned personnel complete the selected system’s actual fastening and verification method, using the specified installation tool and calibration evidence where required. Record the required engagement and fastening findings for the identified location and apply only prescribed witness marks. Keep deficient or unverified connections held; another coupler product’s torque or marking method cannot provide acceptance.
Check before work: Lead verifies the actual required fastening and connection evidence.
066. Protect and hand over the installed continuations
Possible hazards: Unprotected protrusions, disturbed bars or an assumed casting release can injure later workers and conceal unresolved splice work.
Planned controls: Crew restores the required bar protection and support without damaging the completed interfaces. Record accepted installation findings, held locations and any component disposition. Transfer the actual connection record and remaining reinforcement, inspection and casting requirements to the receiving lead; prevent later bending or loading outside the approved detail and retain any applicable structural hold.
Check before work: Receiving lead confirms location records, protection and later work holds.
Example scope and starting conditions
A reinforcing crew will install matched rotating continuation bars in accepted cast-in threaded couplers at an accessible building joint. The actual starter-system instructions govern engagement and fastening. The completed connections remain protected pending separately released reinforcement and concrete work. This fictional learning example describes planned controls; it records no actual inspection or work authorization.
- The accepted cast-in system, compatible continuation bars and structural splice detail are identified. Apparent thread fit is not component compatibility evidence.
- Protected access, bar-rotation clearance and impalement protection are maintained. Engagement, fastening and tool verification follow the actual system; no universal torque or turns are supplied.
- The reinforcing dowel installation link 238120-20 is partial: mechanically connected starter-bar continuations at an accepted cast-in joint only. Drilled or adhesive dowels, field threading, bar cutting or bending, grouted sleeves, cage placement and concrete casting require separate analyses.
Know when to pause
- Cast-in acceptance, component identity, current splice detail or manufacturer installation requirements cannot be confirmed.
- Threads are damaged, engagement is abnormal, the bar cannot rotate safely or unapproved alteration would be needed.
- Required tools, verification evidence, access, bar support or impalement protection are unavailable or disturbed.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- Which records identify and accept these cast-in couplers and their matched continuation bars?
- How will the bar rotate through the required engagement while remaining supported and clear of people and existing reinforcement?
- Who verifies the actual system’s connection criteria, and what protection and later work remain held?
Training and qualifications to confirm
- Selected starter-bar system instruction on component compatibility, thread preparation, required engagement and the specified fastening and verification method.
- Instruction on supported bar handling, rotation and pinch zones, protruding-bar protection and reporting coupler damage or installation conditions outside the approved detail.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
Can the continuation bar be bent or field-threaded when it will not fit the available space?
No alteration is authorized by this operation. Keep the location held and obtain the responsible structural and manufacturer direction for the actual system and joint. Bar geometry, threading and engagement are part of the approved splice detail; a convenient field change can defeat it. This example excludes field fabrication and supplies no universal tightening criterion.
What must the crew record for actual use?
Record joint and coupler locations, actual structural and system instructions, embedded acceptance, bar identity and assigned roles. Document thread, engagement and fastening findings and required tool evidence. Identify held locations, restored protection, receiving lead and casting restrictions; do not prefill an accepted splice result.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Rebar Impalement: Verify the Protection →Manual Handling: Change the Lift Before You Lift →Pre-Job JHA/JSA: What Changed Today? →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Identify the accepted embedded starter system
Hazard: An incorrect coupler or bar designation can create a connection that appears assembled but lacks the approved splice function.
Control: Reinforcement lead matches the construction joint, cast-in coupler locations and actual acceptance records to the current structural detail. Identify the selected compatible continuation bars and obtain the manufacturer’s installation and verification requirements. Hold missing identities or disputed embedded conditions for the responsible technical authority; do not infer compatibility from a thread that begins to turn.
Verification: Lead verifies accepted coupler identity and the actual joint detail.
Why this belongs in the analysis: Installing a bar can conceal the original embedded interface.
2. Prepare protected access and bar support
Hazard: An unsupported long bar, restricted rotation path or exposed starter can strike, trap or impale workers at the joint.
Control: Crew establishes stable protected access, supported staging and the actual bar handling and rotation envelope. Keep nearby people and equipment clear and maintain suitable impalement protection on exposed reinforcement as required. Confirm the selected installation method fits the available clearance; resolve conflicts before positioning a bar rather than bending it or removing protection without a controlled replacement.
Verification: Lead checks bar support, access, rotation clearance and impalement protection.
Why this belongs in the analysis: Safe clearance controls the full bar movement envelope.
3. Prepare the permitted thread interface
Hazard: Damaged threads, debris or an improvised cleaning tool can prevent proper engagement and injure hands or damage the accepted coupler.
Control: Crew removes the designated protective closure through the system’s permitted method and checks the exposed interface and continuation-bar end. Use only the specified preparation and cleaning process and retain protection on unattended couplers. Hold corrosion, cross-thread evidence or damaged components for responsible disposition; do not recut threads, force a tap through the embedded part or apply unapproved lubricant.
Verification: Installer checks component match and permitted interface condition before engagement.
Why this belongs in the analysis: Resolve thread defects before force conceals or worsens them.
4. Engage the matched continuation bar
Hazard: Misalignment, uncontrolled rotation or forced threading can damage the connection and put workers in bar swing and pinch zones.
Control: Installer supports and aligns the correct bar and begins engagement using the actual starter-system procedure. Keep the rotation path clear and advance through the required engagement without forcing a reluctant fit. Stop for unexpected resistance, inadequate clearance or an interface that does not meet the specified condition; obtain technical direction rather than using a longer lever or modifying the bar.
Verification: Installer verifies specified engagement and reports any abnormal fit.
Why this belongs in the analysis: Rotation must achieve the exact system’s required engaged condition.
5. Complete and verify the specified connection
Hazard: A partially engaged or incorrectly fastened splice can be mistaken for a completed structural connection, while unsuitable tools add force and handling hazards.
Control: Qualified assigned personnel complete the selected system’s actual fastening and verification method, using the specified installation tool and calibration evidence where required. Record the required engagement and fastening findings for the identified location and apply only prescribed witness marks. Keep deficient or unverified connections held; another coupler product’s torque or marking method cannot provide acceptance.
Verification: Lead verifies the actual required fastening and connection evidence.
Why this belongs in the analysis: A generic wrench setting cannot verify a selected splice.
6. Protect and hand over the installed continuations
Hazard: Unprotected protrusions, disturbed bars or an assumed casting release can injure later workers and conceal unresolved splice work.
Control: Crew restores the required bar protection and support without damaging the completed interfaces. Record accepted installation findings, held locations and any component disposition. Transfer the actual connection record and remaining reinforcement, inspection and casting requirements to the receiving lead; prevent later bending or loading outside the approved detail and retain any applicable structural hold.
Verification: Receiving lead confirms location records, protection and later work holds.
Why this belongs in the analysis: A completed splice does not authorize a concrete pour.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| The threads fit; it must be the right bar. | Match the accepted embedded coupler and designated continuation bar to the actual structural detail and system compatibility records. |
| Use the usual torque and mark it complete. | Assigned personnel verify the selected system’s actual engagement and fastening criteria with its required tool and evidence. |
Common questions
Can this example be used as a JSA?
Adapt the Task | Hazard | Control analysis to the employer’s JSA and actual work. Confirm assigned checks and record real findings before use.
What changes if the project requires an AHA?
Use the project’s governing AHA format, risk method and acceptance process. The published formwork AHA illustrates additional structure; this example supplies no AHA risk rating or acceptance.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- Ancon Starter Bar Systems: manufacturer installation and compatibility guidance
- Ancon Starter Bar System current product guidance
- OSHA 1926.701 General concrete construction and reinforcing steel protection
Original instructional scenario with planned controls. Primary references support hazard planning. Use actual equipment and product instructions, project design and employer requirements to establish field criteria. This example supplies no inspection findings or work authorization. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 13, 2026