Torch Applied Modified Bitumen Roofing JHA
A JHA breaks the work into steps, hazards and controls. Use this example to build a draft for your actual job and review it with your crew.
Just need the example? Download it here.For the crew
You know the work. Let’s turn that experience into a plan your crew can talk through. Start with today’s job, then check the steps together.
Let’s build your JHA.
Step 1 of 4 · Working draft
Your job
Tell Jenkins what you’re planning and where the work will happen. Use the actual job details.
Use the published example’s suggestions when they fit your task, or write your own steps. These are planned controls, not verified worksite conditions.
Describe an observable step, how someone could be harmed, and the control that acts on that hazard. Identify who checks it and what evidence is needed.
Walk through the plan with the people doing the work. Resolve missing controls and agree who checks them. Moving to the next step does not approve the work.
Confirm people, equipment and emergency arrangements
Record changes, checks, and open actions
Walk the work area, review with the crew, and resolve missing controls. Follow the required approval process. This tool does not judge completeness, verify signatures or authorize work.
Print your own JHA by signing in, or contribute the selected structured categories as a guest. Signing in does not require research participation. Written job details are processed to prepare your export and are stored on our server only if you save to your private company library.
Research purpose, data fields, retention and withdrawal · Privacy notice
Sign-in uses a free account. Your tab draft is retained for the return from sign-in.
Hosted organization saving requires active jSMS access and a company workspace. View jSMS plans.
The export uses landscape pages, task-only continuation pages and a Page X of Y footer in current Chrome or Edge. Review every page. Opening an export is not proof that the JHA was printed or used. The PDF includes its research choice and reference; the private withdrawal link stays in the export’s screen-only receipt.
Device storage and other draft options
Device copies may contain private job information. Clear them when using a shared device.
Your entries stay in this working draft as you move between steps. Required field checks, employer review and work authorization remain separate.
Your Torch Applied Modified Bitumen Roofing JHA
Walk through the job in order. Use these possible hazards, planned controls and checks to start a conversation about your actual work.
011. Release the roof assembly and hot work
Possible hazards: Flame can ignite concealed combustibles or enter occupied building space.
Planned controls: Supervisor verifies system suitability and the hot-work authorization, inspects both roof and affected interior areas and uses an approved flame-free method where the torch method is unsuitable.
Check before work: Check the actual assembly, permit conditions and concealed-area access before fuel setup.
022. Establish fall and fire protection
Possible hazards: Workers can fall while handling rolls; an incipient fire can escape detection.
Planned controls: Maintain the planned fall protection, protected access and evacuation route. Assign the required fire-watch coverage and suitable extinguishing equipment without exposing the watcher to unprotected edges.
Check before work: Supervisor checks protection and fire-watch readiness before ignition.
033. Inspect propane and torch equipment
Possible hazards: Leaks, damaged hoses or unsuitable cylinder placement can cause fire or explosion.
Planned controls: Use the actual propane and torch instructions and applicable LPG requirements for cylinder support, connections and safe leak checks. Remove defective equipment; never heat a frosted cylinder with the torch.
Check before work: Authorized operator completes the specified inspection and leak check before ignition.
044. Apply within the released area
Possible hazards: Flame, hot material and roll handling can burn workers or ignite the assembly.
Planned controls: Follow the approved system method from stable access, control flame direction and keep it away from unseen areas, vents and combustibles. Stop when the released method cannot be maintained.
Check before work: Operator and watcher monitor the actual flame path and adjoining areas.
055. Shut down and secure fuel
Possible hazards: An unattended flame or leaking fuel can ignite after work pauses.
Planned controls: Shut off and secure the torch and fuel by the specified procedure for breaks, changes and closeout. Keep hot equipment away from combustible material and maintain the fire-watch plan.
Check before work: Operator verifies shutdown; watcher continues the required coverage.
066. Complete post-work checks and hand over
Possible hazards: Smoldering material can cause a delayed building fire.
Planned controls: Follow the post-work inspection and monitoring plan. OSHA roofing guidance recommends at least two hours after the last torch is extinguished, including the roof field, flashings and underside. Meet any stricter applicable criteria and transfer continuing watch to an identified person before leaving.
Check before work: Supervisor confirms completed checks and an explicit fire-watch handover.
Example scope and starting conditions
A trained roofing crew will apply a specified torch-compatible modified bitumen system to a released low-slope roof area under the site hot-work authorization. This fictional learning example records planned controls; it supplies no actual inspections or work authorization.
- The roof assembly, concealed combustibles and nearby openings are assessed for this method.
- Fall protection, propane setup, fire prevention and a post-work fire-watch plan are in place.
- This excludes torching onto combustible decks, unseen areas, tanks or a roof assembly not approved for torch application.
Know when to pause
- Assembly, concealed-area access or hot-work conditions are uncertain.
- Fuel leak, hose damage or fire-watch coverage failure occurs.
- Wind, occupancy, fall protection or the approved application method changes.
After a pause, correct the condition, reassess the work, and obtain required authorization before restarting.
Free example and template
No account required. The worked example contains planned controls. The blank template is for your own work; neither includes fabricated inspection results, signatures or approval.
Need help? Ask Jenkins
Jenkins · Your Safety Concierge
What brings you here today? Choose what you’re working on, or tell Jenkins about your situation.
Jenkins matches your words to published starting points. Keep names and private job details in your working draft. Suitable free resources come first.
For managers
Does the team have what it needs to carry out the plan? Give the crew time, equipment and support, and make it clear who will resolve anything that is missing.
Manager checks and supporting resources
Confirm the people doing the work have the time, equipment, information and support to carry out the plan. Agree who checks the controls and who resolves open actions.
Questions to resolve before work
- What establishes that the actual roof assembly permits torch application?
- Which concealed areas and building interiors require fire-watch access?
- What post-work inspection duration and handover do the governing requirements specify?
Training and qualifications to confirm
- Torch-roofing system and LPG equipment instruction by suitably trained personnel.
- Concealed-fire recognition, fire-watch duties and fall protection.
Confirm the actual training evidence for the assigned people. A toolbox talk does not establish competence.
Decisions that change the plan
How long should post-torch fire-watch inspections continue?
OSHA’s Protecting Roofing Workers guidance recommends inspections throughout the day and for at least two hours after the last roof torch is extinguished, including the roof field, flashings and underside of the deck. Apply any longer duration or additional checks required by the hot-work authorization, insurer, manufacturer or site. This is roofing guidance, not a universal interval for every hot-work task.
What must be recorded before this example is used on a job?
Replace the scenario with the actual work, identify additional hazards with the crew, and record the applicable instructions, responsible people, inspection findings, unresolved actions and required authorization. A planned verification is not an inspection result.
Keep planning connected
Resources that support this JHA
Additional tools for task planning and safe work. Start with the free resources; explore paid options only when they meet an additional need.
Toolbox talks for the work
Prepare a practical crew discussion.
Hot Work: Verify the Area and Fire Watch →Gas Cylinders: Identify, Secure and Check →Fall Prevention: Verify the Controls →Torch-Applied Roofing: Verify What the Flame Can Reach →Safety program resources
Review procedures, roles, and requirements.
Browse the existing catalog and confirm the scope and purchase availability of each program.
Browse safety programs →Paid service · Availability
Task-specific training and qualifications
Explore applicable training and qualification needs.
Task-specific training services are not currently available to book here. Start with the free training-needs lookup; a toolbox talk or online course alone does not establish competence or employer authorization.
Review training needs · Free →People, equipment, emergency arrangements and open actions are recorded in the guided JHA’s Crew review step.
Open the crew review step →For safety professionals
How do we know the planning process and controls are working? Connect what the crew reports with field checks, risk decisions and the evidence behind your system.
Industry context, SIF, control verification and AHA review
Guidance and evidence
Review the method, risk decisions and evidence behind the plan. Use the actual jurisdiction, equipment instructions, employer process and project requirements.
Task-by-task control and verification rationale
1. Release the roof assembly and hot work
Hazard: Flame can ignite concealed combustibles or enter occupied building space.
Control: Supervisor verifies system suitability and the hot-work authorization, inspects both roof and affected interior areas and uses an approved flame-free method where the torch method is unsuitable.
Verification: Check the actual assembly, permit conditions and concealed-area access before fuel setup.
Why this belongs in the analysis: A clean roof surface cannot establish what lies beneath.
2. Establish fall and fire protection
Hazard: Workers can fall while handling rolls; an incipient fire can escape detection.
Control: Maintain the planned fall protection, protected access and evacuation route. Assign the required fire-watch coverage and suitable extinguishing equipment without exposing the watcher to unprotected edges.
Verification: Supervisor checks protection and fire-watch readiness before ignition.
Why this belongs in the analysis: Fire-watch duties do not remove the watcher’s own fall exposure.
3. Inspect propane and torch equipment
Hazard: Leaks, damaged hoses or unsuitable cylinder placement can cause fire or explosion.
Control: Use the actual propane and torch instructions and applicable LPG requirements for cylinder support, connections and safe leak checks. Remove defective equipment; never heat a frosted cylinder with the torch.
Verification: Authorized operator completes the specified inspection and leak check before ignition.
Why this belongs in the analysis: An open flame is not a leak-test method.
4. Apply within the released area
Hazard: Flame, hot material and roll handling can burn workers or ignite the assembly.
Control: Follow the approved system method from stable access, control flame direction and keep it away from unseen areas, vents and combustibles. Stop when the released method cannot be maintained.
Verification: Operator and watcher monitor the actual flame path and adjoining areas.
Why this belongs in the analysis: The torch operator cannot observe every concealed fire path alone.
5. Shut down and secure fuel
Hazard: An unattended flame or leaking fuel can ignite after work pauses.
Control: Shut off and secure the torch and fuel by the specified procedure for breaks, changes and closeout. Keep hot equipment away from combustible material and maintain the fire-watch plan.
Verification: Operator verifies shutdown; watcher continues the required coverage.
Why this belongs in the analysis: End of torching is not end of fire risk.
6. Complete post-work checks and hand over
Hazard: Smoldering material can cause a delayed building fire.
Control: Follow the post-work inspection and monitoring plan. OSHA roofing guidance recommends at least two hours after the last torch is extinguished, including the roof field, flashings and underside. Meet any stricter applicable criteria and transfer continuing watch to an identified person before leaving.
Verification: Supervisor confirms completed checks and an explicit fire-watch handover.
Why this belongs in the analysis: A roof-only visual check may miss concealed heat.
Compare control wording
| Needs improvement | More useful for this scenario |
|---|---|
| Be careful around the equipment. | Use the actual propane and torch instructions and applicable LPG requirements for cylinder support, connections and safe leak checks. Remove defective equipment; never heat a frosted cylinder with the torch. |
| Check the area before starting. | Supervisor verifies system suitability and the hot-work authorization, inspects both roof and affected interior areas and uses an approved flame-free method where the torch method is unsuitable. |
Common questions
Can this be used as a JSA?
Use the Task | Hazard | Control structure if it meets the employer’s format. Adapt the boundaries, controls, verification and records to the actual job.
Does this provide a completed USACE AHA?
No. Use the project’s required AHA process, risk method, supporting fields and acceptance requirements. The existing formwork AHA explains the additional structure.
Are these resources part of a paid course?
This walkthrough, browser draft builder and downloads are free public resources, separate from Academy course enrollment.
References and source note
- OSHA Protecting Roofing Workers
- OSHA 1926.150 Fire protection
- OSHA 1926.153 Liquefied petroleum gas
- OSHA 1926.501 Duty to have fall protection
- OSHA 1926.503 Fall protection training
Original worked example developed for the stated scenario. Primary references support the planning framework; the actual equipment manual, product instructions and project design must supply applicable operating and acceptance criteria. Use actual equipment instructions and site requirements alongside these references. Reference review: October 9, 2026.
Developed by Todd Jerome Jenkins, MS, CSP · Edition v1.0 · October 9, 2026
Use the builder’s Print / Save as PDF action after signing in or accepting research participation.